VEK M2E-2
Operating instructions
12
03/06
FEIG ELECTRONIC GmbH
5. Operating elements and connections
Front view:
Empfindlichkeit Kanal 1
Empfindlichkeit Kanal 2
Frequenz low / high
Haltezeit 5min / unendlich
Richtungslogik aus / ein
Dauersignal / Impulssignal
Schleifenzustand / Schleifenkontrolle Kanal 1
Schleifenzustand / Schleifenkontrolle Kanal 2
Schalter Arbeits- / Ruhestromprinzip Kanal 1
Schalter Arbeits- / Ruhestromprinzip Kanal 2
Service
Reset
1
2
2
1
F
1
2
H 5min.
VEK M2E
1
2
3
4
5
6
7
8
Contact assignment 11-pole connector plug:
(see also: device categories, chapter 8)
230V
L
1
50-60Hz N
2
PE
9
2
3
4
1
5
6
1
7
8
2
10
11
Notice:
Relay contacts are pictured in idle condition !
Mixed operation of extra-low- and low voltage at the relays is
not admitted ! ( e.g. 24VDC at relay 1 and 230VAC at relay 2 ).
The durability of the relay contacts is increased by external,
parallel connected RC modules (e.g. 100Ohm/10nF)!