background image

Gramsham 2 · D-84550 Feichten/Alz
Phone +49- 86 23 - 70 35 · Fax +49-86 23 - 70 36
[email protected] 
www.feichtner-maschinenbau.de

Operation Manual Universal Gluing Press “RP-3000”
Release 10/2017 - We reserve the right to make technical changes in the interests of further development 

7

 

Device view/ Main controls

3

1

8

9

10

2

4

5

6

  1)  Hand-hydraulic cylinder
  2)  Base frame
  3)  Swivel pressure shoe (accessory)
  4)  90°-stop device
  5)  Press arm
  6)  Height adjustable pad shoe
  7)  Side pressure with 2 rack-and-pinion gears
  8)  Lifting device for side pressure
  9)  Holding down clamp (Accessory)
10)  Rack-and-pinion gear

Summary of Contents for RP-3000

Page 1: ...e right to make technical changes in the interests of further development OPERATION MANUAL UNIVERSAL GLUING PRESS AND MOUNTING DEVICE Modell RP 3000 Gramsham 2 D 84550 Feichten Alz Phone 49 8623 7035...

Page 2: ...3000 Contents Release 10 2017 We reserve the right to make technical changes in the interests of further development Contents ITEM Page Contents Introduction 3 General information 4 Intended usage 5...

Page 3: ...to which we can congratulate you It shows us that you appreciate quality and technical leadership By purchasing the Feichtner frame press you have the following advantages Optimized pressure control A...

Page 4: ...re included in the scope of delivery or are listed in the spare and wear parts list Accessories must be matched to the basic unit safety and operability For more detailed information please contact th...

Page 5: ...urer does not assume any liability for resulting personal injury and or material damage from improper use It is recommended to consult a person who already has experience with such a machine when asse...

Page 6: ...afety instructions to the machine user and or operators Any operation that affects the safety of the equipment must be omitted The operator must ensure that no unauthorized persons work with or on the...

Page 7: ...eserve the right to make technical changes in the interests of further development 7 Device view Main controls 3 1 8 9 10 2 4 5 6 7 1 Hand hydraulic cylinder 2 Base frame 3 Swivel pressure shoe access...

Page 8: ...Always check whether all the controls on the gluing press are okay Check that the rack and pinion gears and hydraulic cylinders are free from dirt Remove possible glue residues from 90 stop and pad sh...

Page 9: ...at the finished wooden board or frame still receives sufficient pressure observe the max way of the hydraulic pumps If necessary the hydraulic pumps can also be adjusted in their position For this pur...

Page 10: ...pump the hydraulic cylinders downwards until the desired pressing pressure is reached Now place the side pressure pipe in position This is done by actuating the lifting mechanism and thus lifting the...

Page 11: ...interests of further development 11 Crank the racks of the rack and pinion gear on the side pressure pipe to the left until the desired side pressure is reached In the case of angle gluing the swivel...

Page 12: ...hat the workpiece does not bend forward during pressing and the surface becomes even The holding down device clamping device is simply to be mounted from above at the upper and lower cross tubes in th...

Page 13: ...f the hydraulic pumps To release or push up the press shoes press the pump lever at the hydraulic pump all the way up By doing so the pump lever on his part presses on a valve which allows the ram plu...

Page 14: ...nce and to extend the service life of the machine the following maintenance instructions should be observed 1 Allow glue residues to harden and then scrape them off 2 Clean or remove dust from the sur...

Page 15: ...est Regarding liability for faulty design or defective design for material defects the supplier is only liable to the extent that he should have been aware of the defect in the case of application of...

Page 16: ...manual Type Universal gluing press and mounting device RP 3000 Brand Feichtner Serial number __________________________ Manufacture year __________________________ complies with the guidlines of Dire...

Reviews: