Gramsham 2 · D-84550 Feichten/Alz
Phone +49- 86 23 - 70 35 · Fax +49-86 23 - 70 36
[email protected]
www.feichtner-maschinenbau.de
Operation Manual Universal Gluing Press “RP-3000”
8
Release 10/2017 – We reserve the right to make technical changes in the interests of further development
Set up / Operation
Installation:
Place the press in an accessible place with flat ground.
The frame is then anchored to the ground.
Before starting work:
¾
Always check whether all the controls on the gluing press are okay.
¾
Check that the rack-and-pinion gears and hydraulic cylinders are free from dirt.
Remove possible glue residues from 90°-stop and pad shoes, so that a clean gluing (bond)
is guaranteed.
Always check, that all pressure elements are properly hooked and clamped before
starting work!
Calculate the dimensions of the finished wooden board or the finished frame so that
you can adjust the press arms, support shoes and hydraulic cylinders accordingly.
Adjust the press arms in such a way (horizontally move) that a uniform distance and thus a uniform
pressing pressure is produced.