System Options:
Quick Loader
C O N F I D E N T I A L – FEI Limited Rights Data
7-37
Installation
The Quick Loader is pre-installed, no special adjustment is needed only the loading rod is not installed for the
transport.
1.
Unpack the lead glass lid.
2.
Remove four screws holding the cover of the loading rod feedthrough.
3.
Use the same screws to attach the loading rod to the loader chamber.
Loading position
The load / unload position is preset from factory. If a calibration is needed, run the
Quick Loader Alignments
first.
Summary of Contents for Scios 2
Page 1: ...User Operation Manual Edition 1 Mar 2017 ...
Page 103: ...Alignments I Column Alignments C O N F I D E N T I A L FEI Limited Rights Data 4 19 ...
Page 110: ...Alignments 254 GIS Alignment option C O N F I D E N T I A L FEI Limited Rights Data 4 26 ...
Page 170: ...Operating Procedures Patterning C O N F I D E N T I A L FEI Limited Rights Data 5 60 ...
Page 178: ...Maintenance Refilling Water Bottle C O N F I D E N T I A L FEI Limited Rights Data 6 8 ...