I N S T A L L A T I O N I N S T R U C T I O N S
PUR 100421 10.15
mr.steam
®
Steam
SupplyPipe
Endof pipetoberecessed
1/4" (without Acrylic Shield)
1/8" (withAcrylic Shield)
1/8" minimumclearancerequired
whenAcrylic Shieldis used.
Seeinstallationinstructions
providedwiththeAcrylic Shield.
Applywithsiliconeor
equal sealant as required
for moistureseal.
UseTeflon
®
or equal
sealant onpipethreads
Oil Well
STEP 3
STEP 4
STEP 5
Steamhead
(shown with
optional acrylic shield)
Locating Nipple
DropEar
Fitting
All drawings are for illustrative purposes only
3”
2
3/4
”
3
1/2
”
3”
1”
03”
7/8”
IM PO RTAN T:
See the Installation and O peration Manual
provided with the steam generator for additional important
steamhead & control installation and operation information.
Installation:
Steam Head
(
1
⁄
2
" NPT)
INSTALLER: Because the steam head and direct
steam emissions are very hot, locate the steam head where incidental
contact by bather with the steam head or direct steam emission cannot
occur.
STEP 1
Locate steam head 6-12 inches above floor, except for:
1. Tub/shower enclosures, install 6 inches above tub top edge.
2. For enclosures with acrylic or other non-heat resistant
flooring install Acrylic Shield Part Number MS-103938.
3. To prevent door seals from deteriorating do not locate the steam
head where direct steam emission would contact door seals.
STEP 2
Install steamhead with the oil well facing up as shown. Hand
tightening is sufficient when teflon or equal pipe thread sealing com-
pound is used.
IM PO RTAN T N O TE :
to preserve steam head finish, do not use
wrench or other tools to tighten. DO NO T use abrasive cleansers or
chemicals. Use only water with mild soap and a non-abrasive sponge.
Consult with supplier of acrylic, fiberglass and other
non-heat resistant enclosures for recommended steamhead location.
Use Acrylic Shield part number MS-103938. See instructions provided
with steam shield.
STEP 3
Secure a bronze drop ear fitting to a header and run a 1/2"
copper steamline from the steam generator to the drop ear fitting.
Install a temporary nipple (6" or longer)in the drop ear fitting to locate
the steamhead after the wall is finished.
STEP 4
After the wall has been finished, mark on the nipple where the
surface of the wall is. Remove the nipple and measure the portion that
was in the wall (the end to your mark). Subtract 1⁄4" from that dimen-
sion and select a brass nipple of that length to finish the installation.
STEP 5
Wrap teflon tape around the threads of the new nipple and
screw the nipple into the steamhead. Do not use wrenches or tools
which would damage the steamhead's finish. Wrap teflon tape around
the threads of the nipple and screw the nipple and steamhead assem-
bly you just made into the drop ear fitting in the wall. The steamhead
should be flush with the wall and the well must be facing up.