![background image](http://html.mh-extra.com/html/federal-signal-corporation/e-q2b/e-q2b_installation-maintenance-and-service-manual_548453040.webp)
Chapter 5: Mounting the Siren and Control Pad
e-Q2B Siren System
40
VERIFY TEMPLATE DIMENSIONS—Before using the mounting template, verify that
the template is to size and all dimensions correct.
2.
Use the template on page 59 as a guide to scribe the four mounting holes and the cutout on the
mounting surface.
3.
Drill a mounting hole 0.104" in diameter at each of the four scribed marks.
4. Use a sabre saw to cutout the scribed opening for the light.
5.
After completing the wiring of the e-Q2B system, insert the control head into the cutout and secure it
with the four supplied #6B screws.
Summary of Contents for e-Q2B
Page 2: ...blank page ...