background image

Dis assembly instrcutions. 
 

 Disassembly Sequence, Time Schedule  and Tools 

Requirement for AL 60/30  Panel system

.

 

 

Table 1 

 

Sl,No 

Activity 

Time in 

min 

Tools required 

1. 

Disconnect sockets/switches and take 
out the cables. 

Cordless 
machine 

2. 

Removal of  Table Tops 

Cordless 
machine 

3. 

Removal of Gabel Ends 

Cordless 
machine 

4. 

Removal of main Spine frames 

Manual 

5. 

Packing Of Materials. 

Manual 

  

Total time per work station- 15 Mins. 

 

 

The timings are based on a cluster of 4 work stations. The dismantling team 
consists of two persons. For dismantling more number of work stations, larger 
team can be used and the activity can be telescoped

 

 

 

Reviews: