C 10 23
7
Towing
f
Heed all regulations and apply all safety measures applicable for towing heavy con-
struction machines.
m
The towing vehicle must be capable of securing the paver finisher, even on slopes.
Use only approved tow bars!
If necessary, remove any attachments and accessories from the paver finisher and
the screed until the basic width has been attained.
A
Two high-pressure cartridges (2) are
located on both of the travel drive
pumps (1).
The following activities must be carried
out to activate the towing function:
- Loosen lock nut (3) half a turn.
- Screw in the bolt (4) until increased re-
sistance occurs. Then screw the bolt a
further half turn into the high-pressure
cartridge.
- Tighten the lock nut (3) to a torque
of 22 Nm.
m
On completion of the towing process, re-
store the initial status.
1
2
3
4
Summary of Contents for Dynapac Redline DRF25-70C
Page 2: ...www dynapac com ...
Page 26: ...A 2 ...
Page 34: ...B 8 4 Safety devices 1 3 5 10 7 9 11 4 5 6 7 12 2 8 ...
Page 45: ...B 20 71 70 40 41 42 xxxxxxxxxxxxxxxxx 9 9 7 7 ...
Page 90: ...D 10 4 10 15 16 19 18 20 17 14 11 12 13 10 21 22 ...
Page 92: ...D 10 6 10 15 16 19 18 20 17 14 11 12 13 10 21 22 ...
Page 94: ...D 10 8 10 15 16 19 18 20 17 14 11 12 13 10 21 22 ...
Page 96: ...D 10 10 24 23 ...
Page 98: ...D 10 12 28 26 27 25 ...
Page 100: ...D 10 14 28 26 27 25 ...
Page 102: ...D 10 16 30 29 ...
Page 104: ...D 10 18 32 31 ...
Page 106: ...D 10 20 34 35 33 ...
Page 108: ...D 10 22 37 36 ...
Page 110: ...D 10 24 39 38 ...
Page 112: ...D 10 26 40 41 42 43 ...
Page 114: ...D 10 28 44 46 47 45 ...
Page 116: ...D 10 30 77 78 79 80 81 82 83 70 71 72 73 74 75 76 ...
Page 118: ...D 10 32 77 78 79 80 81 82 83 70 71 72 73 74 75 76 ...
Page 122: ...D 10 42 90 91 92 94 93 95 96 96 ...
Page 124: ...D 10 44 ...
Page 155: ...D 40 5 1 3 10 2 8 9 6 7 4 5 ...
Page 157: ...D 40 7 1 3 10 2 8 9 6 7 4 5 ...
Page 160: ...D 40 10 2 1 ...
Page 162: ...D 40 12 2 3 1 ...
Page 164: ...D 40 14 1 2 5 7 6 3 ...
Page 166: ...D 40 16 2 2 3 1 5 4 ...
Page 170: ...D 40 20 5 4 A 2 1 3 ...
Page 172: ...D 40 22 3 1 4 8 9 2 5 7 6 10 11 ...
Page 176: ...D 40 26 1 2 B A C A C ...
Page 178: ...D 40 28 1 2 B A C A C 3 4 ...
Page 180: ...D 40 30 1 2 B A C A C 3 4 ...
Page 182: ...D 40 32 1 2 ...
Page 184: ...D 40 34 1 3 10 9 2 8 7 6 5 4 ...
Page 186: ...D 40 36 2 Malfunctions 2 1 Error code query for engine 3 1 2 ...
Page 190: ...D 40 40 2 2 Error codes ...
Page 191: ...D 40 41 ...
Page 192: ...D 40 42 ...
Page 193: ...D 40 43 ...
Page 194: ...D 40 44 ...
Page 195: ...D 40 45 ...
Page 196: ...D 40 46 ...
Page 213: ...E 10 11 Symbol Meaning Outer auger bearing Auger end bearing ...
Page 249: ...F 20 1 F 20 Maintenance review 1 Maintenance review 73 40 50 80 90 100 30 60 ...
Page 251: ...F 30 1 F 30 Maintenance conveyor 1 Maintenance conveyor ...
Page 258: ...F 30 8 ...
Page 259: ...F 40 1 F 40 Maintenance auger assembly 1 Maintenance auger assembly ...
Page 287: ...F 60 1 F 60 Maintenance hydraulic system 1 Maintenance hydraulic system ...
Page 302: ...F 60 16 ...
Page 303: ...F 73 1 F 73 Maintenance drive units 1 Maintenance drive units ...
Page 316: ...F 73 14 ...
Page 317: ...1 F 80 Maintenance electrical system 1 Maintenance electrical system ...
Page 327: ...11 Relays in the engine compartment K Function 0 Engine start ...
Page 332: ...16 ...
Page 340: ...F 90 8 ...
Page 341: ...F 100 1 F 100 Tests stopping 1 Tests checks cleaning stopping ...
Page 352: ...F 100 12 ...
Page 354: ...F 110 2 2 4 7 5 6 6 3 1 ...
Page 360: ...F 110 8 ...
Page 361: ...www dynapac com Dynapac China Compaction Paving Equipment Co Ltd Tianjin China ...