![Fayat Dynapac Redline DRF25-70C Instruction Manual Download Page 208](http://html1.mh-extra.com/html/fayat/dynapac-redline-drf25-70c/dynapac-redline-drf25-70c_instruction-manual_546875208.webp)
E 10 6
3
Auger extension
Depending on the type of screed, the most diversified working widths can be reached.
A
Auger and screed extension must match.
Refer to the appropriate chapter "Set-up and modification" in the screed
operating instructions:
– screed extension chart
To attain the desired working width, the respective screed extensions, side plates, au-
gers, tunnel plates or cut-off shoes must be mounted.
For working widths of more than 3.00 m, the auger should be fitted with extension
parts on both sides to improve material distribution and to reduce the wear.
f
The diesel engine must be switched off whenever work is performed on the auger.
Danger of injuries!
A
If the operating conditions on the construction site permit an auger extension to be
fitted, or render this necessary, always additionally fit the outer auger bearings.
For auger width extensions with an outer auger bearing on the basic unit, fit the short-
er auger blade to the bearing. Otherwise, destruction between the auger blade and
bearing may occur.
Auger_DEM.bmp
Summary of Contents for Dynapac Redline DRF25-70C
Page 2: ...www dynapac com ...
Page 26: ...A 2 ...
Page 34: ...B 8 4 Safety devices 1 3 5 10 7 9 11 4 5 6 7 12 2 8 ...
Page 45: ...B 20 71 70 40 41 42 xxxxxxxxxxxxxxxxx 9 9 7 7 ...
Page 90: ...D 10 4 10 15 16 19 18 20 17 14 11 12 13 10 21 22 ...
Page 92: ...D 10 6 10 15 16 19 18 20 17 14 11 12 13 10 21 22 ...
Page 94: ...D 10 8 10 15 16 19 18 20 17 14 11 12 13 10 21 22 ...
Page 96: ...D 10 10 24 23 ...
Page 98: ...D 10 12 28 26 27 25 ...
Page 100: ...D 10 14 28 26 27 25 ...
Page 102: ...D 10 16 30 29 ...
Page 104: ...D 10 18 32 31 ...
Page 106: ...D 10 20 34 35 33 ...
Page 108: ...D 10 22 37 36 ...
Page 110: ...D 10 24 39 38 ...
Page 112: ...D 10 26 40 41 42 43 ...
Page 114: ...D 10 28 44 46 47 45 ...
Page 116: ...D 10 30 77 78 79 80 81 82 83 70 71 72 73 74 75 76 ...
Page 118: ...D 10 32 77 78 79 80 81 82 83 70 71 72 73 74 75 76 ...
Page 122: ...D 10 42 90 91 92 94 93 95 96 96 ...
Page 124: ...D 10 44 ...
Page 155: ...D 40 5 1 3 10 2 8 9 6 7 4 5 ...
Page 157: ...D 40 7 1 3 10 2 8 9 6 7 4 5 ...
Page 160: ...D 40 10 2 1 ...
Page 162: ...D 40 12 2 3 1 ...
Page 164: ...D 40 14 1 2 5 7 6 3 ...
Page 166: ...D 40 16 2 2 3 1 5 4 ...
Page 170: ...D 40 20 5 4 A 2 1 3 ...
Page 172: ...D 40 22 3 1 4 8 9 2 5 7 6 10 11 ...
Page 176: ...D 40 26 1 2 B A C A C ...
Page 178: ...D 40 28 1 2 B A C A C 3 4 ...
Page 180: ...D 40 30 1 2 B A C A C 3 4 ...
Page 182: ...D 40 32 1 2 ...
Page 184: ...D 40 34 1 3 10 9 2 8 7 6 5 4 ...
Page 186: ...D 40 36 2 Malfunctions 2 1 Error code query for engine 3 1 2 ...
Page 190: ...D 40 40 2 2 Error codes ...
Page 191: ...D 40 41 ...
Page 192: ...D 40 42 ...
Page 193: ...D 40 43 ...
Page 194: ...D 40 44 ...
Page 195: ...D 40 45 ...
Page 196: ...D 40 46 ...
Page 213: ...E 10 11 Symbol Meaning Outer auger bearing Auger end bearing ...
Page 249: ...F 20 1 F 20 Maintenance review 1 Maintenance review 73 40 50 80 90 100 30 60 ...
Page 251: ...F 30 1 F 30 Maintenance conveyor 1 Maintenance conveyor ...
Page 258: ...F 30 8 ...
Page 259: ...F 40 1 F 40 Maintenance auger assembly 1 Maintenance auger assembly ...
Page 287: ...F 60 1 F 60 Maintenance hydraulic system 1 Maintenance hydraulic system ...
Page 302: ...F 60 16 ...
Page 303: ...F 73 1 F 73 Maintenance drive units 1 Maintenance drive units ...
Page 316: ...F 73 14 ...
Page 317: ...1 F 80 Maintenance electrical system 1 Maintenance electrical system ...
Page 327: ...11 Relays in the engine compartment K Function 0 Engine start ...
Page 332: ...16 ...
Page 340: ...F 90 8 ...
Page 341: ...F 100 1 F 100 Tests stopping 1 Tests checks cleaning stopping ...
Page 352: ...F 100 12 ...
Page 354: ...F 110 2 2 4 7 5 6 6 3 1 ...
Page 360: ...F 110 8 ...
Page 361: ...www dynapac com Dynapac China Compaction Paving Equipment Co Ltd Tianjin China ...