
5.
Check the condition of the spark plug, clean if necessary.
6.
In case of excessive combustion residues or burned off elec-
trodes, replace the spark plug
.
7.
Check the electrode gap of the spark plug with a feeler
gauge, if necessary, adjust the gap.
ð
Nominal value:
0.7 - 0.8 mm (0.028 - 0.032 in)
8.
Carefully screw in the spark plug by hand.
9.
Once the sealing surface of the used spark plug is in contact,
tighten for another 1/8 to 1/4 turn with the spark plug
spanner.
NOTICE!
Danger of engine damage caused by a loose
spark plug!
–
Always screw the spark plug in correctly.
8.9.6 Measures prior to extended shut-down period
8.9.6.1
Measures before shutting down
DANGER!
Danger to life caused by explosive gas-air
mixes!
–
Do not allow gasoline to come into contact with
hot components.
–
Smoking and open fire is prohibited.
–
Keep away from heat sources, sparks and
other sources of ignition.
–
Do not spill any gasoline.
If the machine is shut down for a longer period of time, e.g. winter
season, the following work must be carried out.
Depending on weather influences these conservation measures
will protect the machine for approx. 6 to 12 months.
1.
Park the machine safely
Chapter 6.5 ‘Parking the machine
in secured condition’ on page 65
2.
Allow the engine to cool down for at least 30 minutes.
3.
Clean the machine thoroughly.
4.
Change the engine oil
Chapter 8.7.1 ‘Changing the engine
.
5.
Use fuel stabilizer or empty the fuel tank completely.
Fig. 106
Maintenance – As required
DFP11
100
Summary of Contents for Dynapac DFP11
Page 6: ...Table of contents DFP11 6...
Page 7: ...1 Introduction Introduction DFP11 7...
Page 11: ...2 Technical data Technical data DFP11 11...
Page 15: ...3 Concerning your safety Concerning your safety DFP11 15...
Page 40: ...Concerning your safety Safety components DFP11 40...
Page 41: ...4 Indicators and control elements Indicators and control elements DFP11 41...
Page 48: ...Indicators and control elements Transport wheels DFP11 48...
Page 49: ...5 Checks prior to start up Checks prior to start up DFP11 49...
Page 56: ...Checks prior to start up Checking the water level topping up DFP11 56...
Page 57: ...6 Operation Operation DFP11 57...
Page 67: ...7 Loading transporting the machine Loading transporting the machine DFP11 67...
Page 73: ...8 Maintenance Maintenance DFP11 73...
Page 103: ...9 Troubleshooting Troubleshooting DFP11 103...
Page 109: ...10 Disposal Disposal DFP11 109...
Page 111: ......
Page 112: ......