![Fayat BOMAG BPR 35/60 D Operating Instructions Manual Download Page 82](http://html1.mh-extra.com/html/fayat/bomag-bpr-35-60-d/bomag-bpr-35-60-d_operating-instructions-manual_546881082.webp)
8.9.3 Measures prior to extended shut-down period
8.9.3.1
Measures before shutting down
If the machine is shut down for a longer period of time, e.g. winter
season, the following work must be carried out:
1.
Clean the machine thoroughly.
2.
Clean the water separator.
3.
Fill the fuel tank with diesel fuel, to prevent the formation of
condensation water in the tank.
4.
Change engine oil and clean the oil filter if the oil change was
carried out more than 300 operating hours ago.
5.
Change the fuel filter.
6.
After shutting down store the machine under cover in a dry
and well ventilated room.
7.
Protect the cooled down engine against dust and moisture.
8.9.3.2
Measures before restarting
1.
Replace the fuel filter.
2.
Replace the air filter.
3.
Change the engine oil and clean the oil filter.
4.
Check cables, hoses and lines for cracks and leaks.
5.
Start the engine and run it for 15 to 30 minutes with idle
speed.
6.
Check the oil levels.
7.
Clean the machine thoroughly.
Maintenance – As required
BPR 35/60 D
85
Go to
Discount-Equipment.com
to
order your parts