5.
Insert the transport wheel into the holder.
6.
Secure the transport wheel with the split pin.
7.
Assemble the second transport wheel on the opposite side
and secure it with the split pin.
8.
Fold down the steering rod and engage the locking pawl
lever (1) in working position.
ð
The machine can now be moved.
Fig. 43
Fig. 44
Fig. 45
Loading/transporting the machine – Transport wheels
BPR 35/60 D
57
Go to
Discount-Equipment.com
to
order your parts