Table of Contents
BOMAG
5
BPR 25/40, BPR 25/50
Technical Data
7
Safety regulations
11
Indicators and Controls
19
3.1 General notes
20
3.2 Description of indicators and control elements
20
Operation
23
4.1 General 24
4.2 Tests before taking into operation
24
4.3 Folding down the steering rod
25
4.4 Starting the engine
25
4.5 Work/operation 28
4.6 Shut down the engine
30
4.7 Loading
31
Maintenance
33
5.1 General notes on maintenance
34
5.2 Fuels and lubricants
35
5.3 Table of fuels and lubricants
37
5.4 Running-in instructions
38
5.5 Maintenance table
39
5.6 Clean machine / engine
41
5.7 Check the engine oil level
41
5.8 Check the fuel level
42
5.9 Filling the water tank
42
5.10 Clean air filter
43
5.11 Clean the cooling fins and the cooling air intake openings
45
5.12 Change the engine oil
47
5.13 Checking, cleaning the spark plug
48
5.14 Cleaning the fuel sludge filter
49
5.15 Check the oil level in the vibrator housing
49
5.16 Check the V-belt tension, if necessary replace the V-belt
50
5.17 Checking, adjusting the valve clearance
51
5.18 Clean the fuel screen
52
5.19 Change the oil in the vibrator housing
53
5.20 Check the hydraulic oil level
54
5.21 Check the rubber buffers
56
5.22 Change the dry air filter
57
5.23 Tightening the screws
58
5.24 Engine conservation
59
Trouble shooting
61
6.1 General notes
62
6.2 Engine problems
63
Go to
Discount-Equipment.com
to
order your parts