of the line and, then, make a hole through these two lines. Penetrate an 8 mm diameter expansion bolt and
tighten until 2 mm space is left in-between of a 2,5 diameter slat screw and the expansion bolt. Later, the
product is mounted on its place and the installation will be completed by installing the inner chimney.
EN
Theoperationorder:
1
st
operation:
Installationofhanger
2
nd
operation:
Installation of chimney connection metal sheet
3
rd
operation:
Hanging the chimney hood
4
th
operation:
Installation of lower chimney of the chimney hood
5
th
operation:
Installation of inner chimney
6
th
operation:
Making electrical connection
INSTALLATION :
INFORMATION ABOUT USE OF THE CHIMNEY HOOD
Section 6-1
LCD-Switch Chimney Hood Control Card Features
A
ON-OFF BUTTON
B
MINUS BUTTON
C
PLUS BUTTON