background image

Fast & Fluid Management – SK350 

V 2.0-2015

    

  

                                page 1 

 

 
 
 

 

 

FAST & FLUID MANAGEMENT

SK350 

ENGLISH

 
 
 

 
 

 
 

 
 

 
 
 

 
 

 
 

 
 

 
 
 

 

 

 

 

Summary of Contents for SK350

Page 1: ...Fast Fluid Management SK350 V 2 0 2015 page 1 FAST FLUID MANAGEMENT SK350 ENGLISH...

Page 2: ...ertification Pag 3 Main SK350 components Pag 4 Safety instructions Pag 5 Installation Pag 6 8 Operation Pag 9 12 Maintenance Pag 13 Problem solving Pag 14 15 Service and Support Fuses Pag 15 Specifica...

Page 3: ...nditions referred to in point 6 of the general conditions of sale The warranty obligation described in this article only applies if the goods supplied by F FM have been used in accordance with the man...

Page 4: ...op lid 2 Keyboard Emergency stop button 3 Transformer 4 Power Board 5 Removable front panel 6 Clamping plate 7 Super strut suspension 8 Door handle 9 Shaker frame 10 Can table 11 Can mounting rim 12 E...

Page 5: ...Users should see to it that the machine is kept in good condition Defective components should be replaced 6 In order to prevent physical injury the doors should be closed and the paneling fitted duri...

Page 6: ...le unpacking it Take care not to accidentally close the door before finishing installation as it can then only be unlocked power on the machine Step 2 Remove the frame lock Pull out cord to remove fra...

Page 7: ...d lock the adjustable feet Tip before locking the adjustable feet start a mixing cycle with a small load 5kg While the SK350 runs check if all four feet are firmly in contact with the floor and then l...

Page 8: ...Step 5 Electrical connection Connect the power cable to the socket at the rear of the machine Ensure the emergency stop is unlocked turn clockwise Attention To prevent damage the SK350 may only be con...

Page 9: ...r is plugged into a 220 240V wall socket The power led lighted ON The machine is in stand by modus To awake the machine from its sleeping modus press any of the interface buttons Please note that duri...

Page 10: ...ational center of the can table between the spindles Place filler disc on lid to prevent displacement during operation Remove the can handle before shaking When mixing more than one can use adhesive t...

Page 11: ...t start unless the door is closed Step 2 Program ends or is interrupted remove can To interrupt the mixing program press the stop button Use the emergency stop only in case of a true emergency When th...

Page 12: ...amp the container immediately the shaking starts for the setting time After the shaking period the machine shall stop and will move the clamping plate automatically upwards Before opening the door and...

Page 13: ...parts especially clamping plate spindles Use diluted detergent only and Teflon spray only Though the SK350 is designed to be completely maintenance free periodic greasing of moving parts will ensure i...

Page 14: ...ergency stop is active Turn emergency stop clockwise Machine is overloaded Unload max 35 kg Fuse blown on the socket Shut power off and replace fuse see page 15 Door switch is defective Call service K...

Page 15: ...ntainer s in gravitational centre Service and Support If necessary you can get in touch with your supplier or the local service department or contact the manufacturer directly If you contact the manuf...

Page 16: ...ue 300Kg Product access Internal sliding door Shaking speed 700 rpm Large can table standard Machine size H x W x D 116 x 72 x 61 cm Machine weight empty 180 kg Power input 750W Power supply 220 240V...

Page 17: ...Fast Fluid Management SK350 V 2 0 2015 page 17 Electrical wiring diagram...

Page 18: ...ur hands Discarding the Machine Discarded equipment usually still consists of valuable materials For this reason do not simply throw your machine out with the oversized refuse but ask your supplier wh...

Page 19: ...Fast Fluid Management SK350 V 2 0 2015 page 19 Fast Fluid Management B V 2015 www Fast Fluid com...

Reviews: