III. ENGINE REPAIR
58
27. Test run
The engine is now completely
reassembled. Install engine on a test
bench and carry out a test run. The
engine does not require a long time
running-in program. After a short run
according to below specifications the
engine is ready for normal operation.
Also the use of special break-in oils or
lub. oil additives are
not
recom-
mended.
(Figure 46)
Running-in instruction:
10 min. idle speed, no load
10 min. half speed, half load
20 min. fuel speed, full load
2 min. idle speed, (for cool-
ing down)
During the test run, check for proper
function, unusual noise and leakages.
Low and high idle speed, full load
speed, exhaust gas temperature, lub. oil
temperature and lub. oil pressure should
be recorded. After the test run change
the lub.oil.
Summary of Contents for 15D Series
Page 8: ...III 1 DISASSEMBLY 10...
Page 9: ...II TECHNICAL DATA 11...
Page 15: ......
Page 27: ...III ENGINE REPAIR 28 III 2 DIMENSION TABLE WEARING PARTS...
Page 28: ...III ENGINE REPAIR 29...
Page 29: ...III ENGINE REPAIR 30...
Page 30: ...III ENGINE REPAIR 31...
Page 31: ...III ENGINE REPAIR 32...
Page 32: ...III ENGINE REPAIR 33...
Page 33: ...III ENGINE REPAIR 34...
Page 34: ...III ENGINE REPAIR 35...
Page 35: ...III ENGINE REPAIR 36...
Page 36: ...III ENGINE REPAIR 37...
Page 37: ...III ENGINE REPAIR 38...
Page 38: ...III ENGINE REPAIR 39...
Page 39: ...III ENGINE REPAIR 40...
Page 40: ...III ENGINE REPAIR 41...
Page 41: ...III ENGINE REPAIR 42 III 3 ENGINE REASSEMBLY...
Page 73: ...74...
Page 74: ...75...
Page 75: ...76...
Page 76: ...77...