13
Revision date: 05.13.20 112534
Use the following steps as guides during
assembly:
1. Gather all the components and pvc tubing
shown above and on the previous page and
assemble the supply manifold.
2. Dry fit all connections before you secure
using pvc primer and cement. Apply
WR1095 tape to all threaded fittings before
assembly. Apply tape in a direction that will
unwind when fittings are connected.
3. After constructing the manifold, assemble
the plumbing, pump, and reservoir.
ASSEMBLE SUPPLY MANIFOLD AND CONNECT PUMP TO RESERVOIR—continued
4
Assembly Instructions—Plumbing
1" PVC
1" PVC
psi
0
5
10
15 20
30
25
psi
0
5
10
15 20
30
25
WF3316
WF3316
WF1380
WF1390
WF1380
WF1380
WF2190
WF1030
WR4067
112549
Reservoir
Lid
112548
Reservoir
1" PVC
WF2350
WF2350
WF2190
WF3420
Align the WF1380 tee fittings with the center of the hole in the reservoir. See dashed lines above.
WF1380
WF1380
TOP VIEW OF LID AND
SUPPLY MANIFOLD
WF6990
PVC Cement
&
113372 PVC
Purple Primer
WR1095
Tape