FarmTek GrowSpan PB01700R4 Manual Download Page 10

10

GROWSPAN

 ROUND PREMIUM HIGH TUNNELS

Revision date: 01.01.16

10. Move to 

the last two rafter joints

 and install the first 

section (#131S075) of those purlins. Verify the rafter 

spacing is 4' on-center, and tighten the end clamps 

and cross connectors. 

Do not install the top, center 

purlin until the entire frame is assembled. 

FRAME ASSEMBLY (continued)

NOTE:

 Each purlin assembly consists of 1.315'' x 75'' 

(#131S075) swaged pipes (quantity is determined by 

shelter length) and one (1) 1.315'' x 73.5'' (#131P0735) 

plain pipe to end each purlin run.  

 

Consult the Side Profile diagram in the Quick Start 

section for your building for additional details.

11.  Continue adding rafters and purlin pipe until the frame 

is assembled. 

Secure each purlin splice using a Tek 

screw. See diagram that follows.

12. Finish each purlin run using the plain, pipe 

(#131P0735), and use the final end rafter to complete 

the assembly. If the last end rafter is plumb and the 

purlin run extends beyond the end of the rafter, cut the 

last section of purlin pipe to the required length. 

Install next two purlins at the 

rafter joints in the locations circled 

in this diagram. Dashed lines 

represent the next purlin pipes.

NOTE:

 Typically purlin pipes 

do not

 require cutting. 

Verify that you have the correct plain pipes before you 

decide to cut any pipe to complete the purlin runs. 

 

 

To prevent cover damage, do not allow the plain end of 

any purlin to extend beyond the end of the end rafter. 

Align with the center of the end rafter for best results. 

 

If the purlin is too short to fit into the rafter end clamps 

without pulling the end rafter out of plumb, first verify 

you have the correct pipe. If so, loosen a purlin splice 

and slide the pipes apart. At least half of the tapered 

end must remain inside the adjacent pipe. Drive the Tek 

screw back into the pipe to secure the purlin joint.

13. Once all rafters are set and the four (4) lower purlins 

are in place and secured, return to each pipe splice 

of each purlin run and verify that a Tek screw secures 

each joint. Install a Tek screw (if needed).

14. Continue by installing the top, center purlin. 

Position the bolt side of the end clamps toward the 

inside of the shelter—the same side as the purlin. 

INSTALL TOP, CENTER PURLIN

Complete the following steps:
1.  Move to one end of the assembled frame, find the 

center of the end rafter, and mark the top, center 

location on the outside face of the end rafter. 

2.  Move to the other end of the frame and repeat the step 

to find the top, center of that end rafter.

3.  To keep the top purlin parallel with the lower purlins, 

take a chalk line, stretch it between the two marks, and 

snap it to mark the position of the top purlin. 

 

NOTE:

 For buildings longer than a typical chalk line, 

find the center of an interior rafter and snap the chalk 

line using that mark and the mark on the end rafter. 

Repeat as needed to mark all rafters.

Mark the center of the end 

rafter at both ends to position 

the top, center purlin.

To the 

inside of 

the shelter

End Rafter

Summary of Contents for GrowSpan PB01700R4

Page 1: ...e 01 01 16 Photo may show a different but similar model STK DIMENSIONS PB01700R4 26 W x 12 H x 48 L PB01710R4 26 W x 12 H x 96 L 2016 Growers Supply All Rights Reserved Reproduction is prohibited with...

Page 2: ...t needed during the assembly process For safety reasons those who are not familiar with recognized construction methods and techniques must seek the help of a qualified contractor YOU MUST READ THIS D...

Page 3: ...ded with the shipment To aid in the assembly read through the following definitions before you begin to assemble your shelter Conduit An assembly of pipes used to secure the main cover and end panels...

Page 4: ...ot need to open the plastic bags containing smaller parts such as fasteners or washers if equipped SPECIAL NOTE Baseboards for Frame These instructions describe installing a baseboard recommended at g...

Page 5: ...photos will help you identify the different parts Some parts are not shown 102856 End Clamp 102548 Cross Connector Swaged Plain Swaged and Plain Rafter Sections CC6212 CC6213 Fabric Clips FA4482B Tek...

Page 6: ...Quick Start Guide Ground Level End Rafter Inside Rafter Roll Up Side Conduit Purlins Baseboards are supplied by customer Round Premium High Tunnels OVERVIEW This section describes assembling your high...

Page 7: ...re driving the remaining posts to the required height 8 After all corner posts are accurately installed tie a string line between the tops of the corner ground posts on the same side of the shelter Th...

Page 8: ...crews so they will not touch the cover once it is installed This is typically on the backside of the rafter which will be the surface visible from the inside of the high tunnel once the frame is assem...

Page 9: ...the purlin pipe in the joint where the rafter pipes are connected to keep purlins aligned during assembly 7 Repeat the previous step to install a second purlin section See the above diagram for detai...

Page 10: ...in to extend beyond the end of the end rafter Align with the center of the end rafter for best results If the purlin is too short to fit into the rafter end clamps without pulling the end rafter out o...

Page 11: ...rp edges on the frame and file them smooth so they will not cut the cover 2 Apply two layers of heavy duct tape on all pipe connections and clamps that may contact the cover ANCHOR THE ASSEMBLED FRAME...

Page 12: ...LLATION After the end panels are installed install the main cover The steps to install the main cover include 1 Attach poly latch U Channel 102197 along the high tunnel sides and tops of the high tunn...

Page 13: ...the cover into place Center cover side to side and end to end IMPORTANT To prevent damage to the main cover during installation additional personnel and lifts may be needed INSTALL POLY LATCH U CHANNE...

Page 14: ...irst end rafter until the entire length of the end of the main cover is secured in place 7 Stretch the cover to the other end of the building and repeat the steps to secure the main cover in the U Cha...

Page 15: ...of the Wrist assembly and attach it to the frame and the roll up side 4 Install the Anti Billow Rope system 5 Test the operation of the roll up side 4 Place the assembled conduit at the base of the si...

Page 16: ...ssembly will be located NOTE Verify that the lower end of the channel is slightly off the ground to allow it to move freely when the panel is rolled up and down 5 Secure the upper end of the channel b...

Page 17: ...m channel from the ground end This is the free end of the channel 13 Roll the cover conduit up to the Twist of the Wrist assembly 14 Attach the conduit to the square shaft of the assembly by inserting...

Page 18: ...nance information that follows NOTE If the poly latch U Channel was attached to a ribbon board as suggested the eyebolt can be mounted through the poly latch channel and ribbon board to the inside of...

Page 19: ...at anytime Remove debris and objects that may accumulate on the cover Use tools that will not damage the cover when removing debris Remove snow to prevent excess accumulation Use tools that will not...

Page 20: ...UND PREMIUM HIGH TUNNELS Revision date 01 01 16 QUICK START GUIDE 26 Wide Round Premium High Tunnels Frame shown may differ in length from actual frame 26 0 Width 12 6 15 16 Heigth FRONT Grid Represen...

Page 21: ...01 26R1602 End Clamp 102856 Mid Clamp 102548 End Clamp 102856 Mid Clamp 102548 End Clamp 102856 Mid Clamp 102548 End Clamp 102856 Mid Clamp 102548 End Clamp 102856 Mid Clamp 102548 ATTENTION Except fo...

Page 22: ...PREMIUM HIGH TUNNELS Revision date 01 01 16 7 131S075 1 131P0735 Purlin Run 48 0 Length Customer Supplied Baseboard Customer Supplied Ribbon Board 4 0 on center Rafter Spacing center to center SIDE P...

Page 23: ...PREMIUM HIGH TUNNELS Revision date 01 01 16 96 0 Length 15 131S075 1 131P0735 Purlin Run Customer Supplied Baseboard Customer Supplied Ribbon Boards 4 0 on center Rafter Spacing center to center SIDE...

Page 24: ...id Rafter P urlin Connection View 2 Rafter 102856 View 1 End Rafter Purlin Connection Purlin 102548 Rafter View 2 Mid Rafter Purlin Connection Purlin ATTENTION Install a Tek screw through each clamp i...

Page 25: ...25 GROWSPAN ROUND PREMIUM HIGH TUNNELS Revision date 01 01 16 Space below is reserved for customer notes...

Reviews: