39
GROWSPAN
™
GOTHIC PRO GREENHOUSES AND SYSTEMS
Revision date: 06.06.18 113836_37_38_39DD
Locate these parts to prepare the drop-down curtain for
installation and to attach it to the axle conduit:
• 106816 (1/2" pipe conduit)
• CC5505 (1/8" curtain cord)
• FA4652 (1-1/2" wood screw)
• AS5020 pulleys
• 102921B washers
• Duct tape
• Drop-down curtain
INSTALL THE DROP-DOWN CURTAIN (continued)
NOTE:
Position the wood screw, washer and pulley a few inches away from the rafter on either side of the rafter.
Pulley should hang freely from the wood screw.
Do not overtighten the screw.
3. Move to the next rafter and repeat the steps to install another pulley.
Install one pulley for each rafter along each side
of the frame.
4. Continue installing wood screws, washers and pulleys into the ribbon board
next to each rafter
until all pulleys are
installed
along both sides of the shelter
.
5. Install the curtain conduit and attach cords as described in the next procedure.
Attach Drop-Down Curtain Pulleys
Continue with the steps that follow:
1. Gather the pulleys and the same quantity of 1-1/2" wood screws and washers and move to the inside of the shelter.
2. Slide one pulley onto the threaded shaft of the wood screw then add a washer. Twist the wood screw through the
polycarbonate panel and into the ribbon board next to the first rafter to secure the pulley.
Rafter
Rafter
Rafter
Polycarbonate
Panels
View from
inside the shelter.
Pulley Assembly
Pulley Assembly
Edge of the Ribbon Board
AS5020
Pulley
Rafter
Washer
2" x 6" Board
1" x 4"
Board
FA4652
Wood Screw
FA4652
Polycarbonate
Panel