Manual
SOFTER 15 PS | 20 PS
14
│
23
Tab.6 – Transport position of the machine
Machine Folding Procedure – Transport Position
Initial state: Machine is unfolded and recessed, both ball valves on the drawbar
are open.
1
Lift the machine on rollers, i.e.
extract the roller piston rods to limit
position, i.e. maximum extracted
position, by means of the yellow
circuit.
Lift the machine to the axle, i.e.
extract the axle piston rods to the
limit position, i.e. maximum
extracted position, by means of the
green circuit.
2
Unfold the machine using the red
circuit.
3
Close both ball valves on the
drawbar and then use the yellow
circuit to insert the piston rods of
the side rollers to the end position,
i.e. maximum insertion.
Secure the side frames by the lock
drawbar. Now the machine is ready
for transport.
Warning!!! The machine must only be transported by the axle, not rollers.