Manual
SOFTER 12,5 PS
51
│
54
MAINTENANCE PLAN
Perform the planned maintenance according to the instructions:
Maintenance Task
Daily
(season)
(10 hour)
Once a
week
(50 hours)
Before
season
After
season
Time interval
Wheels/axle
Tyre pressure check
550/45-22,5, 20 PR, pressure 400 kPa
X
X
X
Transport axle bearings – check and potential
clearance adjustment (in a workshop)
X
Tracing wheels
Tyre pressure check
31x15,5-15/ TR-07, pressure 300 kPa
X
X
X
Wheel shaft bearings – check and potential
replacement (in a workshop)
X
Safety measures
Lighting and safety hatched boards – check the
condition, function and cleanliness
X
X
Hazard and safety labels – check that they are
installed and legible
X
Machine lubrication plan
Points of lubrication – lubricate according to
the lubrication plan
Acc. to
the plan
After season
Entire machine
Treat and clean the machine; do not spray oil or similar agents on the plastic parts.
Store the machine away with piston-rods draws in, if possible.
Spray the piston-rods of the hydraulic cylinders with suitable anti-corrosion agents.
Check the tightness of all bolt and plug-in connections (see the torque chart).
Check for any damage of the electric cables and replace if needed.
Brake system
Preserve the anti-freeze fluid for air-brake systems (about 0.1l), ethanol-free, before the last ride, use fluid
recommended by the tractor manufacturer.
Secure the machine against movement by Scotch blocks.
Release the parking brake, release air from the air nozzle and close the brake lines.
The service brake must be released during winter so that it does not get stuck on the brake drum.
Points of lubrication
Grease the points of lubrication according to the lubrication plan, use grease
NGLI 2
!!!
PREVENTION means removing the problem according to the plan,
outside the season, without stress and comfortably before a secondary
problem, an accident or a health hazard arises
.