8.3.1 Machine unfolding procedure
Machine unfolding procedure – work position
Initial position: The machine is lifted on the axle and red valve is open.
1
Unfold the machine using the red circuit and open yellow valve.
2
Draw in the piston-rods of the axle using the yellow circuit into the marginal position, i.e. maximum
insertion. The machine is evenly placed on all tracing wheels.
SETTING THE DOWN PRESSURE OF SIDE FRAMES
•
When the machine has been unfolded, the down pressure of the side
frames must be adjusted to ensure optimal terrain tracing.
•
Set the value of
100 bar (1450 Psi)
on the pressure gauge using the
circuit for unfolding.
32
|
61
Summary of Contents for FANTOM 650 PRO
Page 2: ...2 61 Prepared by Technical Department Farmet a s on 31 05 2017 changes reserved...
Page 4: ...PREFACE 4 61 IMPORTANT READ CAREFULLY BEFORE USE KEEP FOR FUTURE REFERENCE...
Page 17: ...WORK SAFETY LABELS FANTOM 800 PRO FANTOM 850 PRO 17 61...
Page 31: ...COMMISSIONING Machine position for folding Machine position for unfolding 31 61...