15
Assembly - 1066 & 1076 Conventional Auger
Assembly Instructions - PTO Drive
1. Attach the Implement Input Driveline (IID) (Ref. #81) to the gear box with a 7/16" x 2-1/2" spiral
pin (Ref. #82).
2. Mount the gear box shield (Ref. #78) using 1/2" x 3/4" bolt and lockwasher (Ref. #77).
3. Install the Implement Input Driveline hanger (Ref. #85) to the mount on the side of the auger
tube using a 3/8" x 1" bolt, nut and lockwasher combination.
Gearbox is shipped dry from the factory.
Add No. 90 gear lube until 1/2 full.
NOTE: Use a 3/8" x 1-1/4" Grade 2 shear bolt
on the Implement Input Drive. Using other
than a Grade 2 bolt may result in damage to
the drive components.