![Faraone ZP8 Use And Maintenance Instructions Download Page 58](http://html1.mh-extra.com/html/faraone/zp8/zp8_use-and-maintenance-instructions_3420331058.webp)
USE AND MAINTENANCE MANUAL - SECTION 4
AERIAL PLATFORM ZP
– Rev. 05_2018
Page 4-21
Phase 3
Remove the lever under the machine's base carriage being
careful to re-insert the spring lock stop.
Phase 4
Slope the machine until the support trolley's tube touches
the truck's bed. Then, with the pin on the bed, start lifting the machine using
the lever under the base carriage.
Summary of Contents for ZP8
Page 84: ...USE AND MAINTENANCE MANUAL SECTION 9 AERIAL PLATFORM ZP Rev 05_2018 Page 9 7 ...
Page 86: ...USE AND MAINTENANCE MANUAL SECTION 9 AERIAL PLATFORM ZP Rev 05_2018 Page 9 9 ...
Page 88: ...USE AND MAINTENANCE MANUAL SECTION 9 AERIAL PLATFORM ZP Rev 05_2018 Page 9 11 ...
Page 90: ...NOTES ...
Page 91: ......