![Faraone PKS 1200E Use And Maintenance Instructions Download Page 48](http://html1.mh-extra.com/html/faraone/pks-1200e/pks-1200e_use-and-maintenance-instructions_3419222048.webp)
USE AND MAINTENANCE MANUAL - SECTION 4
AERIAL PLATFORM PKS 1200E-920-720 - Rev 02_2016
Page 4-13
Lifting/lowering work platform
After having selected the movement mode of the work platform, move the
cloche forward/backward to move the work platform up/down.
NOTE:
The cloche acts proportionally on work platform movement speed.
The movement power is applied in proportion to the movement of the
cloche from the centre.
PRESS THE DEAD MAN ENABLING
CONTROL ON THE CLOCHE, then
push the cloche in the required
direction of movement.
Indicator LED
The indicator LED's switch on both after a function has been activated by
means of the "work platform run/movement" selector and after an alarm has
been triggered (also signalled by an intermittent buzzer).
The possible alarm conditions are indicated below:
Summary of Contents for PKS 1200E
Page 75: ...USE AND MAINTENANCE MANUAL SECTION 7 AERIAL PLATFORM PKS 1200E 920 720 Rev 02_2016 Page 7 8...
Page 77: ...USE AND MAINTENANCE MANUAL SECTION 7 AERIAL PLATFORM PKS 1200E 920 720 Rev 02_2016 Page 7 10...
Page 78: ...USE AND MAINTENANCE MANUAL SECTION 7 AERIAL PLATFORM PKS 1200E 920 720 Rev 02_2016 Page 7 11...
Page 85: ...USE AND MAINTENANCE MANUAL SECTION 7 AERIAL PLATFORM PKS 1200E 920 720 Rev 02_2016 Page 7 18...
Page 86: ...NOTES...
Page 87: ...Page left intentionally blank...