In  other  cases,  the  controller  is  powered  from  the  main  line  or 
generator. If the voltage on the main line is correct, it is also used to 
charge the battery.

Mounting

1. 

Switch off the power supply of the switchgear.

2. Connect the controller according to one of the following diag

-

rams.

 

It is recommended to use additional contactors for swi

-

tching  the  power  line  (diagram  2).  In  the  case  of  small  loads 
lower than 16 A (AC-1), the system from scheme 1 can be used.

3. Set the desired controller operation parameters.
4. Switch on the power supply of the switchgear.

Description of leads

neutral line (N), common for the generator and the main 

power line

phase line (L) of the main supply network

phase line (L ') from the generator

"+" from the battery

lock  input;  closing  of  the  contact  between  5  and  N 

causes an emergency shutdown of all relays, switching 
off of the generator and disconnection of the receiving 
line

input of output voltage control; line switching is possible 

if there is no voltage on input 6

WARNING!
The controller can work without a connected control 
input,  but  in  this  case  the  protection  against  gluing 
contacts of the actuator relays does not work.

7, 9

power output from the main line and generator

11-12 

relay contacts of generator start-up

Connection scheme

 

connection with load current

 <16 A (AC-1)

connection with contactors at current load

 >16 A (AC-1)

For  proper  operation  of  the  system  it  is  necessary  to 
have  a  generator  equipped  with  an  automatic  start 
function controlled by closing the contact 11-12 of the 
SZR-277 controller

Resetting of the lock is possible by switching off and on 
the controller power supply, short pressing of the lock 
resetting button (input 5) or automatically after 3 minu

-

tes of correct operation of the main power supply line

.

- 5 -

- 7 -

- 8 -

2

3

7

9

11

12

4

1

2

3

9 10

8

7

6

5

11 12

SZR-277

U

min 

(V)

T(s)

L

L

'

START

AL

150

210

180

1

5

10

15

T

k

(s)

5

60

1

20

Ç

Ç

Ç

L'

N/-

12 V

1.2 Ah

to the load

L

lock

generator

L

2

3

7

9

11

12

Generator operation 

In  case  of  incorrect  parameters  of  the  main  line,  the  startup 
process of the generator is carried out according to the following 
scheme: 15 seconds after disconnecting the main line, the 11-12 
contacts that start the generator are closed.
Then,  for  the  time  Tk,  the  controller  waits  for  the  start  and 
stabilization of the generator voltage. In case of a proper start-up, 
contacts 3-9 are closed and the power supply from the generator is 
connected to the receiving line. If the start-up is not completed 
correctly, the generator is shut down for a time 3×Tk, followed by 
another  attempt  at  start-up.  Four  consecutive  unsuccessful 
attempts to start the generator block further attempts to protect 
the battery of the generator against discharge.

After disconnecting the receiving line from the generator, its ope

-

ration is maintained for a time 3×Tk, after which the generator is 
switched off (opening of contact 11-12).
The  battery  connected  to  terminal  4  is  used  to  power  the 
controller when there is no main power supply and the generator 
has not yet started.

4

1

2

3

9 10

8

7

6

5

11 12

SZR-277

U

min 

(V)

T(s)

L

L

'

START

AL

150

210

180

1

5

10

15

T

k

(s)

5

60

1

20

Ç

Ç

Ç

L

L'

N/-

N/-

12 V

1.2 Ah

start of the

generator

to the load

lock

generator