Fanani myShell T.2T ZIP Assembly Instructions Manual Download Page 8

7

FANANI / ASSEMBLY INSTRUCTIONS

6

T.2T ZIP

T.2T ZIP

Fabric opening with motor

operation .3

PE

L1

N

L2

myShell SWITCH MOTOR mechanic limit switch

Operation through test cable with push button panel
(Definitive connection with pre-existing wall switch)

i

IMPORTANT: limit switches are NOT pre-setted, after completion the electrical connections proceed

with the limit switches programming , following the procedure with attention.

i

IMPORTANT: Connect the motor to the grid is necessary to let descend the fabric

myShell SWITCH MOTOR electronic limit switch

Operation through test cable with push button panel
(Definitive connection with pre-existing wall switch)

1) remove the CLIP

2) insert the
operating rod into its
clutch

3) insert the CLIP to block
the rod

3. Fabric opening with manual operation

FANANI / ASSEMBLY INSTRUCTIONS

MANUAL OPERATION

Operation through shaft drive crank with articulated rod.

la CLIP viene fornita
pre-assemblata
sulla testa dell’asta di
manovra

i

IMPORTANT: it is necessary to insert the rod before moving the fabric.

PE

L

N

Mains cables

Motor cables

Blue

Brown

Green/yellow

Blue

Brown

Green/yellow

Black

myShell RC MOTOR software 5.14

Remote control operation

Remote control

1 channel

Remote control

5+1 channels

Stop

Up

Down

Stop

Up

Down

Channel

indicator

Channel
selector

PE

L1

N

Mains cables

Motor cables

Blue

Black

Green/yellow

Blue

Brown

Green/yellow

Black

Brown

L2

Up
Down

Push button panel

Program
button

Up
Down

Push button panel

Mains cables

Motor cables

Blue

Black

Green/yellow

Blue

Brown

Green/yellow

Black

Brown

Summary of Contents for myShell T.2T ZIP

Page 1: ...Rev 1 03 17 T 2TZIP ASSEMBLY INSTRUCTIONS...

Page 2: ......

Page 3: ...uides fixing p 9 p 12 p 14 p 17 Checking material p 2 Before starting p 3 Components detail p 4 Box fixing Limit switches programming with remote control Limit switches programming with push button pa...

Page 4: ...nd or side beam 5x8 self drilling screws with hex head for box and guides NR 3 ceiling supports up to L cm 480 FACE fixing NR 2 ceiling supports counter bracket L frontal up to L cm 230 NR 3 ceiling s...

Page 5: ...ed The mounting as the working operations have to be execute by skilled personel only in scrupulous mode respectin the current security laws TRANSPORT HANDLING STORAGE The roller blind is properly pac...

Page 6: ...g support Face fixing support Aluminium cap 78 square pin ZIP holder crank side rank xternal guide nternal guide Floor guide fixing bracket Bottom rail weight Bottom rail cap Bottom rail ZIP guide wit...

Page 7: ...fixing supports must be aligned in presence of a wall out out of square apply an adequate spacer Resultant fissures can be compensate with the brush up to cm 0 5 maximum 5 8 T 2T T 2 5 8 FACE FIXNIG S...

Page 8: ...ock the rod 3 Fabric opening with manual operation FANANI ASSEMBLY INSTRUCTIONS MANUAL OPERATION Operation through shaft drive crank with articulated rod la CLIP viene fornita pre assemblata sulla tes...

Page 9: ...scend the fabric myShell SWITCH MOTOR electronic limit switch Operation through test cable with push button panel Definitive connection with pre existing wall switch PE L N Mains cables Motor cables B...

Page 10: ...STRUCTIONS T 2T ZIP HOW TO OPERATE use the rod to OPEN THE FABRIC spin in the opposite direction to CLOSE the fabric 1 APERTURA 2 CHIUSURA MANUAL OPERATION Operation through crank with articulated rod...

Page 11: ...screw and tighten it to the box joint Once complteted the first guide proceed with the second one GUIDE FIXING fix the guide directly to the wall screws and dowels are not included by using the prepa...

Page 12: ...ntly to insert the ZIPsliding track into the zip guide Insert the ZIP sliding track into the external guide profile than complete the guide profile placi9ng the internal profile Fix the internal guide...

Page 13: ...Example of condition to be corrected 9 0 9 0 9 0 9 0 Window opening Window opening height 9 0 9 0 Window opening height Window opening top width Window opening bottom width Guides fixing 5 Insert the...

Page 14: ...about cm 20 far from the box Fabric stopped i IMPORTANT during setting the motor enters the DEAD MAN mode The fabric automatically moves and stops by simply pressing and releasing the UP or DOWN butt...

Page 15: ...order the motor will confirm the operation with a Then repeat the programming operation startin from phase 3 PROGRAM STOP DOUBLE CLICK UP LIMIT SWITCH i IMPORTANT before cancelling the limit switches...

Page 16: ...witch until the motor stops automatically bottom rail stops against the box UP WARNING KEEP PRESSED THE UP BUTTON WITHOUT RELEASING IT TILL THE BOTTOM RAIL STOPS AGAINST THE BOX AND THE MOTOR PERCEIVE...

Page 17: ...K clic clic clic 5 END OF SETTING At the end of the procedure check the limiti switches 7 1 Push Button PROGRAM 7 2 Keep pressed the button and at the same time press the button PROGRAM DOWN 7 3 Relea...

Page 18: ...tor confirms the operation with a DOUBLE CLICK 4 PROGRAMMING OVER the roller blind can work with 2 remote controls Other than the main one up to 15 remote controls can be added MAIN remote control alr...

Page 19: ...measures and trim the guides Disassemble the internal guide and check the guide cleaning MOTOR OPERATION The motor perceives the command only if the remote control is close Remote control battery need...

Page 20: ...Fanani srl www fananitende it Via Caduti di Sabbiuno 7 40011 Anzola dell Emilia Bologna Italy T 39 051 401320 F 39 051 403022 skype fananitende info fananitende it...

Reviews: