15
8.2.3.2.2 List of supplies
Designation
Commentaries
Quantity
5.5 mm drill bit
Drilling for the anti-rotation screw
1
Drill bit between 12 and 16 mm
Central hole drilling
1
Tapered reamer, diameter of 20
Central hole drilling
1, optional
Electrical cables
2 rigid-conductor power cables,
cross-section and length
depending on the vehicle layout
(*).
Cross-section must be under 1.5
mm
Cable pass
Rubber grommet, outer diameter
according to the drilled hole (*)
1 per unit
(optional)
Cable crimps
Only needed if the installed cable
is a flexible one, according to the
chosen cable cross-section (*).
The section of the crimp must be
under 1.5 mm
2 per unit
(*) refer to the chapter "Electrical recommendations."
8.2.3.3 Prerequisite installation
8.2.3.3.1 Pole topology
The pole on which the FX9 validator is installed must be straight and vertical, with a cross-section
diameter between 30 and 40 mm.
The device is designed to be installed in a vertical position, right-side-up.
8.2.3.3.2 Electrical recommendations
Please refer to section 8.2.1 Electrical recommendations.
Warning: The wire cross-section and total cable diameter will determine the type of cable
pass to be used and the actual drilling diameter on the bar.
8.2.3.3.3 Removal of the existing system
If the pole is already equipped with existing equipment, first remove it. If both devices are to be
used at the same time, make sure that a lower clearance of at least 8 cm is respected, as detailed
on the drilling template.