18
Phase 2
- Hook the hood to the propping bar (fig. 02).
- Check the hood’s alignment using the fixing screws.(fig. 02). The upper screw (B) set the
distance from the wall, the lower (C) the vertical slide.
Phase 3
To avoid any unhooking of the hood fix it to the wall with the screws and wall anchors sup-
plied as follows:
- through the holes on the back of the hood and any strap on the cover.
- Insert in pipe union D pipe E (fig. 3)
- Should the fixing include a rear flue see fig. A.
Phase 4 (optional)
- Position chimney (G) and extension (H) as shown in fig. 04.
- Insert in G extension H, making it slip until the required height is reached.
- When happy with the location, lean bar L against the wall, check with a spirit level the
horizontal alignment and mark two fixing points at the ends of the bar.
- Drill a hole, insert 2x4 mm. wall anchors and fix bar L with the screw provided.
- Screw extension H to bar L Using screws M.
Summary of Contents for DIAMANTE
Page 2: ......
Page 45: ...43 RUS A 1 5...
Page 46: ...44 65 10 B C 65 25 6 01 EN60335 2 31 11 07 2002 TC61 7 12 1 15 10 11 Diamante Gleam 53 10...
Page 47: ...45 O D 70 C 3 E F...
Page 48: ...46 F 6 F G ON OFF 1 2 3 1 2 3 4 4 7 3 15 30 Diamante Diamante...
Page 49: ...47 Diamante 2 10 5 3 5 5 5 2 10 H 1 A1 A2 2...
Page 50: ...48 www falmec com I 1 A DIAMANTE a b H1 2 2 c 90 T5 13 d b e 2 GLEAM L 1 I 2 3 4...
Page 51: ...49 H2 3 15 Fasteel 4 M N 1 A O1 X 525 X 530 650 A 2 2 8...
Page 52: ...50 2 O2 O2 3 03 D E 03 A 4 G H O4 G H L 2 2 4 L M H L...
Page 61: ...Note...