____________________________________________________________________________
- 35 -
Figure 3-23 RAMP Test Continuous Way
1. Set “Way” as CONT;
2. Set “CV-1” and “CV-2” output voltage value;
3. Set “Width-1” and “Width-2” output last time;
4. Set “Slew-UP” and “Slew-DN”;
5. Set output current “CC”.
6. Press
to start RAMP test.
-----------------------------------------------------------------------------------------------------------------------
Voltage rise and fall time is determined by rise/fall slew rate, output voltage last time is
determined by width time set.
-----------------------------------------------------------------------------------------------------------------------
RAMP test pulse way
In pulse RAMP test way, if a trigger signal is received, the power supply will immediately switch from CV-1 to CV-2,
and then return to CV-1 after maintaining CV-2 for a pulse width time.
Figure 3-24 RAMP Test Pulse Way
RAMP test toggle way
In toggle way, if a trigger signal is received, the power supply will switch once between CV-1 and CV-2.
Summary of Contents for FTP3000 Series
Page 2: ......