For users
- 2 -
c.
Vacuum completely before welding, field welding is not allowed, welding can only be
performed by professional personnel in professional maintenance center.
d.
Installation must be stopped if any gas leakage, and the unit must be returned to
professional maintenance center.
3. Transportation & Storage
a.
Sealing is not allowed during transportation
b.
Transporting goods at a constant speed is needed to avoid sudden acceleration or
sudden braking, so as to reduce the collision of goods.
c.
The unit must be far away from any source of fire.
d.
Storage place must be bright, wide, open and good ventilation, ventilation equipment is
required.
4. Maintenance Notice
a.
If maintenance or scrap is required, contact an authorized service center nearby
b.
Qualification requirement
All operators who dispose gas must be qualified by valid certification which issued by
professional agency.
c.
Please strictly comply with the requirement from manufacturer when maintenance or
filling gas. please refer to the technical service manual.
Summary of Contents for Rapid RIC55
Page 2: ......
Page 20: ...For installers and professionals 17 APPENDIX 1 HEATING PRIORITY WIRING DIAGRAM OPTIONAL...
Page 21: ...For installers and professionals 18 APPENDIX 2 HEATING PRIORITY WIRING DIAGRAM OPTIONAL...
Page 22: ...For installers and professionals 19 APPENDIX 3 HEATING PRIORITY WIRING DIAGRAM OPTIONAL...
Page 78: ...F r Monteure und H ndler 18 Anhang 1 Schaltplan f r Heizpriorit tsfunktion Optional...
Page 79: ...F r Monteure und H ndler 19 Anhang 2 Schaltplan f r Heizpriorit tsfunktion Optional...
Page 80: ...F r Monteure und H ndler 20 Anhang 3 Schaltplan f r Heizpriorit tsfunktion Optional...
Page 111: ......
Page 112: ...Version E12Ir32 1...