Chapter 4 - page 7
MCO-TCO work mode
4.6.3 ADDING OR INSERTING A NEW OPERATION
To add or insert an operation take the same steps as to store an operation.
* Define the desired block or cycle, assigning this the relevant data.
* Press
to access the list of part-programs stored.
* Move over the operation after which the block or cycle is to be stored and press
4.6.4 MODIFYING AN ALREADY EXISTING OPERATION
To modify an operation take the following steps:
* Use the pointer to select, in the right-hand column, the block or cycle to be modified.
* Press
The CNC will display the relevant edition page for this operation.
* Modify all the data required.
To store the modified operation again:
* Press
to access the list of part-programs stored.
The CNC displays the pointer over the same operation.
To select another position use the
. The new operation will be inserted after this
point.
* Press
If one wishes to place the modified operation in its previous location, the CNC will display
a message asking if one wishes to replace the previous operation or keep this, inserting the
new one after.
In the following example the "User cycle" operation is modified
You have
Option Replace
Option Replace
1.- User cycle 5
1.- User cycle 5
1.- User cycle 5
2.- User cycle 2
2.- User cycle 2
2.- User cycle 5
3.- User cycle 2
Note: One can select an existing operation, modify this and then insert this somewhere else and
even in another part-program.