9
2/ INSTALLING YOUR APPLIANCE
PREPARING THE HOOD
Note: On stainless steel hoods, carefully
remove the plastic protective film from all
exterior surfaces of the hood and decorative
flues, prior to final installation.
1
Remove the hood from the carton.
2
Install the vent into the duct connector of the
hood with 4 pcs mounting screws (4*8mm).
INSTALLING THE HOOD
Note: at least two people will be required to mount the
hood.
1
Raise the hood into its mounting position.
2
Fix the hood onto the angle irons with 16 pcs of mounting
screws (4*14mm). See picture as shown.
3
Pull the duct as the direction showed on the picture, and
make it attach onto the vent.
4
Loosen the slide, and pull the outside chimney as shown.
EN
Summary of Contents for 60CFP-36IX
Page 1: ......
Page 2: ...2 FR EN FR ES PT 38 26 3 14 ...
Page 4: ...4 1 NOTICES TO THE USER EN ...
Page 14: ...14 FR 14 ...
Page 16: ...16 1 AVIS AUX UTILISATEURS FR ...
Page 26: ...26 ES 26 ...
Page 28: ...28 1 AVISO A LOS USUARIOS ES ...
Page 38: ...38 38 PT ...