English
17 EN
The test screen permits manual operation
of the components in the machine.
Press the icon
.
Volumetric meter
incremental counter
instant boiler
temperature
tested part
boiler
pressure
boiler
resistance
Boiler load solenoid
valve
Here is the table of symbols used to define the moving parts that can be
accessed
:
MP
Pump motor
G1÷G3
Coffee dispensing solenoid valves
Eac
Hot water solenoid valve
Eaf
Cold water solenoid valve
Eav
Steam water solenoid
Evc
Boiler load solenoid valve
Em
Pressure-reset solenoid valve
Ein1
÷
Ein3
Pre-infusion solenoid valve
boiler activation
percentage
Boiler activation percentage:
Modulation percentage of the heating power of the boiler.
Boiler resistance:
Activation of resistance elements on the basis of the power selected.
Total power divided into: RC1 = ⅔ - RC2 = ⅓
Full power cycle: RC1 ON / RC2 ON Low power cycle: RC1 ON / RC2 OFF
RC1 OFF / RC2 OFF RC1 OFF / RC2 OFF
6. Testing
level signal;
water
level in boiler
The selection of the parts to be moved is done by pressing the icons and
; the operation takes place by pushing the button which indicates the name of
the part.
Testing
Testing
Testing
1
2
Summary of Contents for E71 E
Page 2: ...I 1 14 15 15 12 3 16 5 2 2 15 Tsn 6 6 7 PRG 11 4 3 4 3 4 13 10 9 8 12 17 19 18...
Page 52: ...English 47 EN 14 Cup Warmer 1 2 3...
Page 53: ...English 48 EN 15 Stainless steel front panel 1 2...
Page 55: ...English 50 EN 17 Draining the boiler water...
Page 57: ...English 52 EN 20 Coffee boiler 0 6 mm...
Page 58: ...English 53 EN 21 display panel...
Page 59: ...English 54 EN 22 Junction Box 23 Safety thermostat 1 4 3 2 1 4 2 3...
Page 61: ...English 56 EN FUSE BATTERY Battery Fuse CR 2032 3V CR 2032 3V...