background image

2

VIGILO

VIGILO

fully retractable oil-hydraulic bollard

English

Meccanica Fadini s.n.c.

Director in charge

CE DECLARATION OF CONFORMITY of the manufacturer:

Meccanica Fadini snc (Via Mantova, 177/A - 37053 Cerea - VR - Italy) declares under own responsibility that: 

Vigilo

 complies 

with the 2006/42/CE Machinery Directive, and also that it is sold to be installed in an “automatic system”, along with original 
accessories and components as indicated by the manufacturing company. An automatic gate operator is, by law, a 
“machinery” and therefore the installer must fit the equipment with all of the applicable safety norms. The installer is also 
required to issue the installer’s Declaration of Conformity. The manufacturer is not liable for possible incorrect use of the 
product. The product complies with the following specific norms: analysis of the risks and subsequent action to cure them 
as per EN 12445 and EN 12453,  Low Voltage Directive 2014/35/UE, Electromagnetic Compatibility 2014/30/UE. In order to 
certify the product, the manufacturer declares under own responsibility the compliance with the EN 13241-1 PRODUCT 
NORMS.

GENERAL WARNINGS FOR PEOPLE SAFETY

INTRODUCTION 

This operator is designed for a specific scope of applications as 
indicated in this manual, including safety, control and signaling 
accessories as minimum required with 

FADINI

 equipment. 

 

Any applications not explicitly included in this manual may 
cause operation problems or damages to properties and 
people. 

 Meccanica Fadini snc is not liable for damages 

caused by the incorrect use of the equipment, or for 
applications not included in this manual or for malfunctioning 
resulting from the use of materials or accessories not 
recommended by the manufacturer. 

 The  manufacturer 

reserves the right to make changes to its products without 
prior notice. 

 All that is not explicitly indicated in this manual

is to be considered not allowed.

BEFORE INSTALLATION

Before commencing operator installation assess the suitability 
of the access, its general condition and the structure. 

To check that the ground is stable, to avoid subsequent settling 
or deformation in the traffic control post installation area. 

 

Make sure that there is no risk of impact, crushing, shearing, 
conveying, cutting, entangling and lifting situations, which 
may prejudice people safety. 

 Do not install near any source of 

heat and avoid contacts with flammable substances. 

 Keep all 

the accessories able to turn on the operator (transmitters, 
proximity readers, key-switches, etc) out of the reach of the 
children. 

 Transit through the access only with stationary 

operator. 

 Do not allow children and/or people to stand in the 

proximity of a working operator. 

 To ensure safety in the 

whole movement area of a bollard it is advisable to install 
photocells, sensitive edges, magnetic loops and detectors. 

 

Use yellow-black strips or proper signals to identify dangerous 
spots. 

 Before cleaning and maintenance operations, 

disconnect the appliance from the mains by switching off the 
master switch. 

 If removing the actuator, do not cut the 

electric wires, but disconnect them from the terminal box by 
loosening the screws inside the junction box.

INSTALLATION

All installation operations must be performed by a qualified 
technician, in observance of the Machinery Directive 
2006/42/CE and safety regulations EN 12453 - EN 12445. 

Verify the presence of a thermal-magnetic circuit breaker
0,03 A - 230 V - 50 Hz upstream the installation. 

 Use 

appropriate objects to test the correct functionality of the 
safety accessories, such as photocells, sensitive edges, etc. 

 

 

Carry out a risk analysis by means of appropriate instruments 
measuring the crushing and impact force of the main opening 
and closing edge in compliance with EN 12445. 

 Identify the 

appropriate solution necessary to eliminate and reduce such
risks. 

  In case where the gate to automate is equipped with a 

pedestrian entrance, it is appropriate to prepare the system in 
such a way to prohibit the operation of the engine when the 
pedestrian entrance is used. 

 Apply safety nameplates with CE 

marking on the gate warning about the presence of an 
automated installation. 

 The installer must inform and instruct the end user about the 

proper use of the system by releasing him a technical dossier, 
including: layout and components of the installation, risk 
analysis, verification of safety accessories, verification of 
impact forces and reporting of residual risks.

INFORMATION FOR END-USERS

The end-user is required to read carefully and to receive 
information concerning only the operation of the installation 
so that he becomes himself responsible for the correct use of it. 

 The end-user shall establish a written maintenance contract 

with the installer/maintenance technician (on -call). 

 Any 

maintenance operation must be done by qualified technicians. 

 Keep these instructions carefully.

WARNINGS FOR THE CORRECT OPERATION OF THE 
INSTALLATION

 

For optimum performance of system over time according to 
safety regulations, it is necessary to perform proper 
maintenance and monitoring of the entire installation: the 
automation, the electronic equipment and the cables 
connected to these. 

 The entire installation must be carried 

out by qualified technical personnel, filling in the Maintenance 
Manual indicated in the Safety Regulation Book (to be 
requested or downloaded from the site 
www.fadini.net/supporto/downloads). 

 Operator: maintenance inspection at least every 6 months, 

while for the electronic equipment and safety systems an 
inspection at least once every month is required. 

 The 

manufacturer, Meccanica Fadini snc, is not responsible for 
non-observance of good installation practice and incorrect 
maintenance of the installation.

DISPOSAL OF MATERIALS

Dispose properly of the packaging materials such as 
cardboard, nylon, polystyrene etc. through specializing 
companies (after verification of the regulations in force at the 
place of installation in the field of waste disposal). Disposal of 
electrical and electronic materials: to remove and dispose 
through specializing companies, as per Directive 2012/19/UE. 
Disposal of substances hazardous for the environment is
prohibited

.

Summary of Contents for VIGILO 2250

Page 1: ...EN 13241 EN 12453 EN 12445 VIGILO VIGILO 2250 2263 2280 2250 2263 2280 GB Instructions manual pages 1 16 the gate opener FULLY RETRACTABLE OIL HYDRAULIC BOLLARDS POST DIAMETER 100 mm...

Page 2: ...e mains by switching off the master switch If removing the actuator do not cut the electric wires but disconnect them from the terminal box by loosening the screws inside the junction box INSTALLATION...

Page 3: ...e of rust treated steel 200 mm diameter bollards are also available in stainless steel AISI 304 version The product s hallmark is its ease of installation once the housing has been secured the operato...

Page 4: ...ractable post with hoisting connection English fully retractable oil hydraulic bollard PRELIMINARY OPENING OF ALL FUNCTIONAL COMPONENTS Start by removing the cover plate to reveal the operator and sep...

Page 5: ...lectricity cables with a 1 5 mm section for a maximum distance of 50 metres For distances of over 50 metres use electric cables with sections suited to the installation 2x1 mm cable RG58 1 MIRI 4 Led...

Page 6: ...draulic bollard Pic 4 Pic 5 850 stroke 500 mm 960 stroke 600 mm 1 140 stroke 800 mm ARRANGING THE HOUSING Check soil natural permeability 50 liters of water must be able to soak away in not longer tha...

Page 7: ...e housing The subsequent phase of this operation consists in threading the motor limit switch solenoid valve and LED power supply electric wires through the piping and simultaneously starting to delic...

Page 8: ...ng and controlling operations The magnetic loop detector is a safety device operating all the time to detect any transiting vehicle the bollard is prevented from rising should a vehicle cross the loop...

Page 9: ...ts on the Elpro S40 board are to be bridged and the respective connections with the Elpro S40 programmer and having completed thorough risk analysis the first operation manoeuvres can be performed If...

Page 10: ...ilizer to terminals 22 and 23 in the Elpro S40 control box Pic 12 VIGILO with solenoid valve VIGILO with solenoid valve VIGILO with solenoid valve SOLENOID VALVE STABILIZER GROUND LEVEL CLOSURE COVER...

Page 11: ...Dimensions per gate leaf Weight per gate leaf Installation date Quantity of models installed Maintainer Date NOTE WELL this document must record any ordinary and extraordinary services including inst...

Page 12: ...English VIGILO VIGILO fully retractable oil hydraulic bollard 12...

Page 13: ...the electronic board controlling the bollard s e g flooded relay contacts oxidized terminal clamps etc Check the correct functioning and positioning of the limit switches Check the release system for...

Page 14: ...ned these are to comply with the laws in the country of installation Meccanica Fadini is not liable for any possible damages derived from incorrect use or from any use not indicated in this manual fur...

Page 15: ...263 Frequency of use intensive Service cycle rise 5 9 s dwell 30 s lower 5 2 s dwell 30 s Complete cycle time 71 s Complete cycles rise dwell lower dwell No 51 hour Annual cycles with 8 hours of use p...

Page 16: ...275 G 850 960 1 140 H 1 350 1 560 1 940 Pic 15 30 000 J 160 000 J Various factors such as the compaction index soil permeability coefficient and kind of concrete may reduce the values indicated in th...