4
PIC. 2
PIC. 4
Before setting the fixing base plate with concrete fully screw
up the 4 long bolts so that the threads are all out. Set the plate
horizontally levelled as shown in the illustration at 80 mm from
the gate. Corner “A” of GIRRI 130 base plate is to coincide with
the reference line drawn on the fixing base plate.
CENTRING BASE PLATE FITTED WITH LONG BOLTS PROVIDING ANCHOR-
LIKE FIXING IN CONCRETE
1
st
OPERATION
GATE
REFERENCE LINE
FIXING
BASE
PLATE
SPIRIT LEVEL
CABLE INLET TUBE. RECOMMENDED TO BE
POSITIONED ON THE LEFT OF THE FIXING
BASE PLATE. HOLE DIAM. 50 mm.
2
nd
OPERATION
80
GATE SIDE
A
4 NOS. LONG BOLTS FULLY
SCREWED UP
FIRST PULL OUTWARDS, THEN RAISE THE
OPERATOR TO REMOVE IT FROM THE LONG BOLTS
ADJUSTMENT NUT TO SET THE OPERATOR AT A SUITABLE HEIGHT SO THAT
THE COG CAN PROPERLY MESH THE TOOTHED RACK.
INLET FOR THE CABLES FROM THE PUSH BUTTONS, KEYSWITCHES,
PHOTOCELLS, RADIO RECEIVER, FLASHING LAMP AND MAINS
1
st
2
nd
IT IS IMPORTANT THAT ALL THE ELECTRIC CABLES ARE DISCONNECTED
ELEC. CABLE INLET
Once mounted the operator GIRRI 130 on to the fixing base
plate, push the operator towards the gate until the four bolts
lay against the holes in the base plate. In this position the cog
must perfectly mesh the toothed rack, and the “base reference
line” is fully visible. To remove the operator, first unscrew the
4 nuts, pull the operator towards the outside so to free the cog
from the toothed rack.
TOOTHED RACK
WITH FIXING
BRACKETS
EARTH
OPERATOR
DRIVING
COG
LIMIT STRIKING
PLATE WITH FIXING
BRACKET
REFERENCE MARK “BASE
LINE”
CENTRING BASE PLATE.
FIXED
PIC. 3
Summary of Contents for Girri 130
Page 1: ...G B INSTALLATION MANUAL...