background image

Foundation 2 no. pads

200 x 200 x 700mm in 
C20 concrete 
(recommendation only)

M10 x 75mm sleeve 
anchor into 12mm hole 
in foundation with 
anti-vandal armour ring

7

5

12

410 Ctrs

8

9

0

1760 Ctrs

4

5

0

Ground Level

1800

545

Foundation 2 no. pads

200 x 200 x 700mm in C20 

concrete (recommendation only)

410 Ctrs

4

5

0

545

8

9

0

540 Ctrs

580

Ground Level

Foundation 2 no. pads 

200 x 200 x 700mm

in C20 concrete 

(recommendation only)

Installation Instructions

ALL INSTALLATION WORKS TO BE CARRIED OUT BY COMPETENT PERSONNEL - INSTALL AS COMPLETE UNIT

Seat (Surface Fix)

Chair (Surface Fix)

Util Seat / Chair - 

(surface fix option)

1.  Install suitable foundation pads (see illustration) each with top face at ground level

2. Position bench in correct orientation with bases centrally on foundation pads; 
    then mark hole positions through fixing lugs

3. Remove the bench; drill holes Ø12mm x 75mm deep (or as bolt manufacturer’s 
    recommendations)

4. Clear debris from holes

5. Reposition bench unit and fix to foundation pads using 4 no. zinc-coated M10 x 
    75mm sleeve anchors tightened to 50Nm (or as per manufacturer’s instruction). 
    Ensure bench remains level during fixing process. Finally hammer an anti-vandal 
    armour ring over 

each bolt head to prevent tampering

6. Check level

IMPORTANT NOTE:

Ensure  that  stainless  steel  is  protected  during  site  cutting  of  stone  –  contamination  from  disc  cutters  will 
produce corrosion on stainless steel components.

5

UTIL SEAT/CHAIR installation

Reviews: