1760 Ctrs
Ground Level
1800
470
Foundation 2 no. pads
200 x 200 x 700mm in C20
concrete (recommendation only)
340 Ctrs
4
5
0
1
0
0
1760 Ctrs
450
Ground Level
1800
470
Foundation 2 no. pads
200 x 200 x 700mm in C20
concrete (recommendation only)
340 Ctrs
Foundation 2 no. pads
200 x 200 x 700mm in
C20 concrete
(recommendation only)
M10 x 75mm sleeve
anchor into 12mm hole
in foundation with
anti-vandal armour ring
7
5
12
1
0
0
7
5
12
Foundation 2 no. pads
200 x 200 x 700mm in
C20 concrete
(recommendation only)
M10 x 75mm sleeve
anchor into 12mm hole
in foundation
Installation Instructions
ALL INSTALLATION WORKS TO BE CARRIED OUT BY COMPETENT PERSONNEL - INSTALL AS COMPLETE UNIT
Bench (Surface Fix)
Bench (Sub-surface Fix)
Util Bench -
(surface & sub-surface fix options)
1. Install suitable foundation pads (see illustration) each with top face at ground
level
(or with top face 100mm below ground level for sub-surface fix)
2. Position bench in correct orientation with bases centrally on foundation pads;
then mark hole positions through fixing lugs.
3. Remove the bench; drill holes Ø12mm x 75mm deep (or as bolt manufacturer’s
recommendations).
4. Clear debris from holes.
5. Reposition bench unit and fix to foundation pads using 4 no. zinc-coated M10 x
75mm sleeve anchors tightened to 50Nm (or as per manufacturer’s instruction).
Ensure bench remains level during fixing process.
6.
(**Surface fix only**)
Hammer an anti-vandal armour ring over each bolt head to
prevent tampering.
7. Check level
(and reinstate ground level if necessary - sub-surface fix)
IMPORTANT NOTE:
Ensure that stainless steel is protected during site cutting of stone – contamination
from disc cutters will produce corrosion on stainless steel components.
4
UTIL BENCH installation
(Surface Fix)
(Sub-surface Fix)