background image

500

1000

1

000

10

0

1

5

00

1130

1

1

30

Ground Level

Joining plate

Tree guard 

fixing eye

25mm (S14) 
pan-head self 
tapping screw

Tree grille frame

Upper guard 

ring plate

M8 x 20mm 

anti-vandal 

button head 

bolt & nut

Tree guard 
frame

Tree grille

M8 x 20mm anti-vandal 

button head bolt

Grille ring plate

Lower guard 

ring plate

Installation Instructions

ALL INSTALLATION WORKS TO BE CARRIED OUT BY COMPETENT PERSONNEL - INSTALL AS COMPLETE UNIT

Circular tree guard set out

Circular Tree Guard & Grille 

(sub-surface fix only)

1.  Dig appropriate sized hole for tree (approx. two times the width of the tree root ball and the same depth as 
    the ball)

2. Position and correctly orientate tree grille frame centrally over hole so that the top of the frame is at ground 
    level.  Ensure that frame is stable

3. Check level of frame & re-instate ground level up to frame edge (ideally setting frame in concrete for stablilty).

4. Position tree in centre of hole and back fill over root ball.  Do not back fill too far over the top of the root ball 
    or this may cause the trunk bark to rot, damaging the tree.  Lightly tread down backfill to secure tree.

5. Attach the two grille panels to the grille frame using 8 no. M8 x 20mm anti-vandal button head bolts.  Tighten 
    to 14Nm.

6. Fix down both halves of the guard frame onto the grille ring plates using 10 no. M8 x 20mm anti-vandal 
    button head bolts.  Tighten to 14Nm.

7. Attach the two joining plates to the top of the frame (using 4 off 25mm x S14 pan head screws) to secure the 
    two frame halves together.

8. The tree guard fixing eyes can be used to secure the tree trunk if necessary.

IMPORTANT NOTE:

Ensure  that  stainless  steel  is  protected  during  site  cutting  of  stone  –  contamination  from  disc  cutters  will 
produce corrosion on stainless steel components.

4

CIRCULAR TREE GUARD & GRILLE installation

Reviews: