
19
EN
4
.1 - Installation
Place the slicer on a well leveled, smooth,
dry and stable plane ,suitable to support
its weight.
4
.2 - Electric connection
Install the slicer in the immediate vicinity of
an outlet to CEE standards derived from
a system that complies with applicable
regulations.
It is the user’s responsibility
to verify
the suitability and proper functioning of
the electrical system (supply line, outlet,
distribution panel, differential thermal
magnetic circuit breaker protection, system
grounding).
Before executing the connection
check that the characterisitcs of the
power supply network correspond to
those indicated on the nameplate of the
slicer.
4
.3 - Control of operation and blade
rotation direction
• Press the button “
I
” (1) to start the
machine and verify whether the
warning light is on (3).
INSTALLATION AND PRELIMINARY CHECKS
• Check that the blade (11) rotates in
the direction indicated by the arrow
(counterclockwise looking at the
machine from the blade plate side).
• For slicers with three-phase supply:
if the blade (11) rotates in the
opposite direction,
immediatly stop
the machine
pressing the button
“
0
” (2) and require the intervention
of qualified personnel to reverse
the power cords inside the plug.
• Check the smoothness of the product
tray (8) and of the product pusher
(10).
• Check the operation and adjustment
of the graduated knob and the gauge
plate (15).