
22
Fig. 5
EN
INSTALLATION AND PRELIMINARY CHECKS
4
.1 - Installation
Place the slicer on a well levelled, smooth,
dry and stable plane ,suitable to support
its weight.
4
.2 - Electric connection
Install the slicer in the immediate vicinity of
an outlet in compliance with EC standards
derived from a system that complies with
applicable regulations.
It is the user’s responsibility to verify
the suitability and proper functioning
of the electrical system (supply line,
outlet, distribution panel, differential
magnetothermal circuit breaker protection,
grounding system).
☞
Before executing the
connection check that the
characteristics of the power
supply network correspond
to those indicated on the
nameplate of the slicer (look
pag.13 fig.2).
4
.3 - Checking functioning and the
blade rotation direction
• Press button “
I
” (3) to start the machine
and check that the warning light turns
on (5).
• Check that the blade (11) rotates in
the direction indicated by the arrow
(anticlockwise when looking at the
machine from the blade plate side).
• Check for the smoothness of the
product tray (8) and of the product grip
(10).
• Check that the control knob (6) and the
gauge plate (17) work and are adjusted
correctly.
Product grip vertical sliding lever
(Only for versions “TS-V” and “TS-VR”)
By keeping the lever (30) pressed, it is
possible to quickly raise or lower the
product grip (10).
30
10
Summary of Contents for F250 TS-V
Page 2: ......
Page 4: ......
Page 54: ...52 EN...
Page 55: ...53 F250 TS V F300 TS VR Ed 11 2013 EN...
Page 56: ...54...
Page 57: ...55 F250 TC V F300 TC VR Ed 11 2013...
Page 62: ...2019...