EN
5
5
11
12a
305
X
116
1÷2
116
650 min.
7.2.1
INSTALLATION
Wall drilling and bracket fixing
Wall marking:
• Draw a vertical line on the supporting wall up to the ceiling, or as high as practical, at the
centre of the area in which the hood will be installed.
• Draw a horizontal line at 650 mm above the hob.
• Place bracket
7.2.1
on the wall as shown about 1-2 mm from the ceiling or upper limit align-
ing the centre (notch) with the vertical reference line.
• Mark the wall at the centres of the holes in the bracket.
• Place bracket
7.2.1
on the wall as shown at X mm below the first bracket (X = height of the
upper chimney section supplied), aligning the centre (notch) with the vertical line.
• Mark the wall at the centres of the holes in the bracket.
• Mark a reference point as indicated at 116 mm from the vertical reference line and 305 mm
above the horizontal reference line.
• Repeat this operation on the other side.
• Drill ø 8 mm holes at all the centre points marked.
• Insert the wall plugs
11
in the holes.
• Fix the lower bracket
7.2.1
using the
12a
screws (4,2 x 44,4) supplied.
• Fix the upper bracket
7.2.1
and the air outlet connection support
7.3
together using the 2
screws
12a
(4,2 x 44,4) supplied.
• Insert the two screws
12a
(4,2 x 44,4) supplied in the hood body fixing holes, leaving a gap
of 5-6 mm between the wall and the head of the screw.
Summary of Contents for BELLA EG8 X A60 FB EXP
Page 1: ...Instructions Manual Manuel d Instructions Bedienungsanleitung Manual de instrucciones j i i...
Page 43: ...RU 4 43 650 I 120 0 04 2...
Page 47: ...RU 4 47 3 7 2 1 4 12c 2 9 x 9 5 2 12c 2 9 x 9 5 12c 2 1 2 2 2 7 2 1 12c...
Page 48: ...RU 4 48 L T1 T2 T3 T4 S1 L S1 T1 T2 T3 T4 L T1 T2 5 5 T3 3 S1 T4 10 5 5 S1 100 200...
Page 49: ...RU 4 49 1 5 LR03 AAA S1 2 T3 3...
Page 50: ...RU 5 50 S1 4 5 T2 T3 3 20...
Page 51: ......
Page 52: ...991 0270 557_ver1...