15
16.
Attach wall mount (22857) to top rear c-channel (22854) using two (2) ¼” bolts, four (4) flat washers,
and two (2) hex nuts. (Figure 14)
17.
Using a level, adjust height of feet (61807) to make rack system level.
18.
Using 9/16” combination wrench, tighten 3/8” Hex nut installed in step 3 into bottom of rack system
to keep feet tight.
Figure 14