background image

 

1)  ATTENTION! To ensure the safety of people, it is 

important that you read all the following instruc-

tions. Incorrect installation or  incorrect use of the 

product could cause serious harm to people.

 2)  Carefully read the instructions before beginning 

to install the product.

 3) Do not  leave packing materials (plastic, poly-

styrene, etc.)   within  reach of  children as  such 

materials  are  potential  sources  of  danger.

 4)  Store these instructions for  future reference.
 5)  This product was designed and built strictly for the 

use indicated in this documentation. Any other use, 

not expressly indicated here, could compromise 

the good condition/operation of the product and/

or be a source of danger.

 6)  FAAC declines all liability caused by improper use 

or use other than that for which the automated 

system was intended.

 7)  Do not install the equipment in an explosive at-

mosphere: the presence of  inflammable gas or 

fumes is a serious danger to safety.

 8)  The mechanical parts must conform to the provi-

sions of Standards EN 12604 and EN 12605.

    For non-EU countries, to obtain an adequate level 

of safety, the Standards mentioned above must be 

observed, in addition to national legal regulations.

 9)  FAAC is not responsible for failure to observe Good 

Technique in the construction of the closing ele-

ments to be motorised, or for any deformation that 

may occur during use.

 10) The installation must conform to Standards EN 12453 

and EN 12445.

    For non-EU countries, to obtain an adequate level 

of safety, the Standards mentioned above must be 

observed, in addition to national legal regulations. 

 11) Before attempting any job on the system, cut out 

electrical power.

 12) The mains power  supply of the automated system 

must be fitted with an all-pole  switch with con-

tact opening distance of 3 mm or greater. Use of 

a 6A thermal breaker with all-pole circuit break is 

recommended.

 13) Make sure that a differential switch with threshold 

of 0.03 A is fitted upstream of the system.

 14) Make sure that the earthing system is perfectly 

constructed and connect metal parts of the 

closure to it. 

 15) The automated system is supplied with an intrinsic 

anti-crushing safety device consisting of a torque 

control. Nevertheless, its tripping threshold must be 

checked as specified in the Standards indicated 

at point 10.

 16) The safety devices (EN 12978 standard)  protect 

any danger areas against 

mechanical movement 

Risks

, such as crushing, dragging, and shearing.

 17) Use of at least one indicator-light (e.g. FAACLIGHT 

) is recommended for every system, as well as a 

warning sign adequately secured to the frame 

structure, in addition to the devices mentioned 

at point “16”.

 18) FAAC declines all liability as concerns safety and 

efficient operation of the automated system, if 

system components not produced by FAAC are 

used.

 19) For maintenance, strictly use original parts by 

FAAC.

 20) Do not in any way modify the components of the 

automated system.

 21) The installer shall supply all information concern-

ing manual operation of the system in case of an 

emergency and shall hand over to the user the 

warnings handbook supplied with the product.

 22) Do not allow children or adults to stay near the 

product while it is operating.

 23) Keep remote controls or other pulse generators 

away from children, to prevent the automated 

system from being activated involuntarily.

 24) Transit is permitted only when the automated 

system is idle.

 25) The user must not attempt any kind of repair or 

direct action whatever and contact qualified 

personnel only.

 26) Check at least every 6 months the efficiency of 

the system, particularly the efficiency of the safety 

devices (including, where foreseen, the operator 

thrust force) and of the release devices.

 27) Anything not expressly specified in these instruc-

tions is not permitted.

WARNINGS FOR THE INSTALLER

GENERAL SAFETY OBLIGATIONS

Summary of Contents for C720

Page 1: ...C720 C721 C720 C721...

Page 2: ...circuit break is recommended 13 Make sure that a differential switch with threshold of 0 03 A is fitted upstream of the system 14 Make sure that the earthing system is perfectly constructed and connec...

Page 3: ...AIR 10 11 ACCESSORIES 10 11 1 BATTERY KIT 10 11 2 RADIO MODULE 10 CE DECLARATION OF CONFORMITY FOR MACHINES DIRECTIVE 2006 42 EC Manufacturer FAAC S p A Address Via Calari 10 40069 Zola Predosa BOLOGN...

Page 4: ...power cut if emergency batteries are not installed or if the operator is not in service 1 Cover casing 2 Motor lock 3 Link cover 4 Motor release handle 5 Transformer 6 Foundation plate 7 Cable passag...

Page 5: ...ed plus mechanical limit switches to prevent the gate derailing The gate slide track must be linear and horizontal Manual movement of the gate must be easy throughout its travel The soil must permit s...

Page 6: ...late with GALVANISED STEEL rack NYLON rack left closure Dimensions in mm This symbol must always face to wards the gate 3 Prepare a foundation plinth as shown in Fig 7 and wall in the foundation plate...

Page 7: ...nsions in mm with rack in GALVANISED STEEL 3 Adjust the height of the gearmotor and the distance from the gate with reference to the dimensions in Fig 10 Operation required for correct fastening of th...

Page 8: ...en the rack and the gate positioning it at the top of the slot In this way the slot play will enable any adjustments to be made 3 Mark the drilling point on the gate Drill a 6 5 mm hole and apply thre...

Page 9: ...ting any work on the control board connections programming mainte nance always turn off power Observe points 10 11 12 13 14 of the GENERAL SAFETY OBLIGATIONS Follow the instructions in Fig 3 to arrang...

Page 10: ...eration of the automated system approximately 40 mm must be left from the mechanical limit switches 7 TESTING THE AUTOMATED SYSTEM Once the operator has been installed carry out a thorough operational...

Page 11: ...of the safety devices including the motor thrust force which must comply with current standards and of the release devices 10 REPAIR Contact an authorised Repair Centre for repairs 11 ACCESSORIES 11...

Page 12: ...f after the selected pause time If semi automatic operating mode has been selected a second pulse must be sent to re close the gate An opening pulse issued during the re closing stage always causes a...

Page 13: ...79 6645 faactm info faacgroup com www faac de INDIA FAAC INDIA PVT LTD Noida Delhi India tel 91 120 3934100 4199 www faacindia com IRELAND NATIONAL AUTOMATION LIMITED Boyle Co Roscommon Ireland tel 35...

Reviews: