background image

1

ENGLISH

  1)  ATTENTION! To ensure the safety of people, it is important that you read 

all the following instructions. Incorrect installation or  incorrect use of 
the product could cause serious harm to people.

  2)  Carefully read the instructions before beginning to install the product.
  3)  Do not  leave packing materials (plastic, polystyrene, etc.)   within  reach 

of  children as  such materials  are  potential  sources  of  danger.

  4)  Store these instructions for  future reference.
  5)  This product was designed and built strictly for the use indicated in this 

documentation. Any other use, not expressly indicated here, could 
compromise the good condition/operation of the product and/or be 
a source of danger.

  6)  FAAC declines all liability caused by improper use or use other than that 

for which the automated system was intended.

  7)  Do not install the equipment in an explosive atmosphere: the presence 

of  inflammable gas or fumes is a serious danger to safety.

  8)  The mechanical parts must conform to the provisions of Standards EN 

12604 and EN 12605.

 

  For non-EU countries, to obtain an adequate level of safety, the Stand-

ards mentioned above must be observed, in addition to national legal 
regulations.

  9)  FAAC is not responsible for failure to observe Good Technique in the 

construction of the closing elements to be motorised, or for any defor-
mation that may occur during use.

 10)  The installation must conform to Standards EN 12453 and EN 12445.
 

  For non-EU countries, to obtain an adequate level of safety, the Stand-

ards mentioned above must be observed, in addition to national legal 
regulations. 

 11)  Before attempting any job on the system, cut out electrical power.
 12)  The mains power  supply of the automated system must be fitted with an 

all-pole  switch with contact opening distance of 3 mm or greater. Use 
of a 6A thermal breaker with all-pole circuit break is recommended.

 13)  Make sure that a differential switch with threshold of 0.03 A is fitted 

upstream of the system.

 14)  Make sure that the earthing system is perfectly constructed and con-

nect metal parts of the closure to it. 

 15)  The automated system is supplied with an intrinsic anti-crushing safety 

device consisting of a torque control. Nevertheless, its tripping thresh-
old must be checked as specified in the Standards indicated at point 
10.

 16)  The safety devices (EN 12978 standard)  protect any danger areas 

against 

mechanical movement Risks

, such as crushing, dragging, and 

shearing.

 17)  Use of at least one indicator-light (e.g. FAACLIGHT ) is recommended 

for every system, as well as a warning sign adequately secured to the 
frame structure, in addition to the devices mentioned at point “16”.

 18)  FAAC declines all liability as concerns safety and efficient operation of 

the automated system, if system components not produced by FAAC 
are used.

 19)  For maintenance, strictly use original parts by FAAC.
 20)  Do not in any way modify the components of the automated sys-

tem.

 21)  The installer shall supply all information concerning manual operation 

of the system in case of an emergency and shall hand over to the user 
the warnings handbook supplied with the product.

 22)  Do not allow children or adults to stay near the product while it is 

operating.

 23)  Keep remote controls or other pulse generators away from children, 

to prevent the automated system from being activated involuntarily.

 24)  Transit is permitted only when the automated system is idle.
 25)  The user must not attempt any kind of repair or direct action whatever 

and contact qualified personnel only.

 26)  Check at least every 6 months the efficiency of the system, particularly 

the efficiency of the safety devices (including, where foreseen, the 
operator thrust force) and of the release devices.

 27)  Anything not expressly specified in these instructions is not permit-

ted.

WARNINGS FOR THE INSTALLER

GENERAL SAFETY OBLIGATIONS

EC DECLARATION OF CONFORMITY FOR MACHINES

(DIRECTIVE 2006/42/EC)

Manufacturer: 

FAAC S.p.A.

Address:

 

Via Benini, 1  - 40069  Zola Predosa BOLOGNA - ITALY

Declares that: 

Operator mod.  C720

 

is built to be integrated into a machine or to be assembled with other machinery to create a machine under 
the provisions of Directive 98/37/EC;

 

conforms to the essential safety requirements of the following EEC directives:

   
 

2006/95/EC    Low Voltage Directive 

 

2004/108/EC  Electromagnetic Compatibility Directive 

 

and also declares that it is prohibited to put into service the machinery until the machine in which it will be 
integrated or of which it will become a component has been identified and declared as conforming to the 
conditions of Directive 2006/42/EEC and subsequent amendments.

 Bologna, 

01-07-2009

 

 

     The 

Managing 

Director

 

   

 

 

 

                A. Marcellan

Summary of Contents for C720

Page 1: ...C720 C720...

Page 2: ...must be checked as specified in the Standards indicated at point 10 16 The safety devices EN 12978 standard protect any danger areas against mechanical movement Risks such as crushing dragging and she...

Page 3: ...HANICAL INSTALLATION 6 5 4 INSTALLING THE RACK 7 5 4 1 STEEL RACK TO WELD Fig 11 7 5 4 3 NYLON RACK TO SCREW Fig 13 7 5 4 2 STEEL RACK TO SCREW Fig 12 7 6 OPERATIONAL START UP 8 6 1 ELECTRONIC BOARD C...

Page 4: ...d when the operator is not working and therefore no electric lock needs to be installed A convenient manual release device allows the gate to be manoeuvred in the event of a power cut if emergency bat...

Page 5: ...per guide must be provided plus mechanical limit switches to prevent the gate derailing The gate slide track must be linear and horizontal Manual movement of the gate must be easy throughout its trave...

Page 6: ...NYLON rack left closure Dimensions in mm This symbol must always face to wards the gate Prepare a foundation plinth as shown in Fig 7 and wall in the foundation plate supplying one or more sheaths for...

Page 7: ...with rack in GALVANISED STEEL Adjust the height of the gearmotor and the distance from the gate with reference to the dimensions in Fig 10 Operation required for correct fastening of the rack and to...

Page 8: ...it at the top of the slot In this way the slot play will enable any adjustments to be made Mark the drilling point on the gate Drill a 6 5 mm hole and apply thread with a 8 mm male tap Screw the bolt...

Page 9: ...the control board connections programming mainte nance always turn off power Observe points 10 11 12 13 14 of the GENERAL SAFETY OBLIGATIONS Follow the instructions in Fig 3 to arrange the cables in t...

Page 10: ...approximately 40 mm must be left from the mechanical limit switches 7 TESTING THE AUTOMATED SYSTEM Once the operator has been installed carry out a thorough operational check of all accessories and co...

Page 11: ...the motor thrust force which must comply with current standards and of the release devices 10 REPAIR Contact an authorised Repair Centre for repairs 11 ACCESSORIES 11 1 BATTERY KIT Install the batter...

Page 12: ...er the selected pause time If semi automatic operating mode has been selected a second pulse must be sent to re close the gate An opening pulse issued during the re closing stage always causes a rever...

Page 13: ...n in vorliegendem Handbuch sind unverbindlich FAAC beh lt sich das Recht vor ohne die wesentlichen Eigenschaften dieses Ger tes zu ver ndern und ohne Verbindlichkeiten in Bezug auf die Neufassung der...

Reviews: