background image

P a g e

 | 

2

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

STEP 1 

Please ensure that the door is free swinging, not binding and any closers (such as surface mount, in-
head pivot closers, hinge closers) are removed prior to commencement of installation. 

STEP 2 

Inside every A951 cardboard box, there is a 1:1 Scale Mounting Template (See below). Please use 
this template for the position of the mounting holes, both for the operator and the arm. If for any 
reason, this is not available please refer to the A951  manual and pages 12  through to 13  for the 
mounting holes positions.  

Please also use appropriate fixings for the material that you are fixing the operator to. In General, 
60mm of Softwood, 40mm of Hardwood, 10mm of Aluminium or 6mm of Steel. 

STEP 5 

Depending on the arm used, adjust parameter “at” in Basic Programming as per below. 

 

 

STEP 3 

Once the operator and arm are mounted to the header and door, wire main power to the A951 as 
below. 

STEP 4 

The A951 uses an on-board programming system comprising of a display and function buttons. The 
display will invert to display the correct way up depending whether it is mount on a R/H or L/H door. 

Programming of the unit can also be undertaken via the KP Evo, which will be required if using the 
Master/Slave functionality. 

Please see below for a brief illustration on using the on-board programming function buttons for either 
Basic Programming or Advanced Programming. 

Reviews: