background image

770 N 

732615 - Rev.A

ENGLISH

Translation of the original instructions

Thank you for choosing our product. FAAC S.p.A. is sure you will get the 
performances you expect to satisfy your requirements. All our products 
are the result of a many years’ experience in the field of the automated 
systems.

 In the middle of the manual you will find a detachable booklet 

containing all the images for the installation.

1.  IMPORTANT WARNINGS FOR THE INSTALLER

• Carefully read the whole manual before beginning to install the ope-

rator.

• Store the manual for future reference.
• The correct operation and the declared technical specifications are 

only valid if the instructions given in this manual are strictly observed 
and only FAAC S.p.A. accessories as well as safety device are used.

• Due to the lack of a mechanical clutch, it is necessary to use a control 

unit with an adjustable electronic clutch.

• The automated system was designed and built to control vehicle 

access. Avoid any other use.

• The operator cannot be used to move safety exits or gates installed 

on emergency routes (escape routes).

• Do not transit when the gate is moving.
• If the leaf you wish to motorise features a built-in door for pedestrian 

passage, the door must be equipped with a safety switch in order to 
disable operation of the gate when the door is open.

• Anything not expressly specified in this manual is not permitted.

2.  DESCRIPTION OF THE COMPONENTS

With reference to the fig.1

Pos.

Description

Supporting box

Operator

Gate support frame

110° manoeuvre lever system

140° manoeuvre lever system (optional)

Release device

Cover

 

Draining hole

Cable routing holes

Lubrication hole

3. TECHNICAL SPECIFICATIONS

Model 770 N

230V

24V

System power supply

230V~ 50Hz

Motor power supply

230V~

50Hz

24V

"

Thermoprotection (°C)

140

/

Capacitor (

μ

F)

12.5

/

Absorbed power (W)

380

70

Max. torque (Nm)

330

330

Nominal torque (Nm)

220

200

Opening angle (°)

110

(140 and 180 with kit)

Angular speed (°/sec.)

6

6

Max leaf length (m)

3.5 (110°) - 3 (180°) - 2.5 

(140°)

Max leaf weight

See fig.2

Usage frequency and type

S3 30%

100%

Protection class

IP 67

Noise level dB(A)

<70

Operating temperature (°C)

-20  +55

Weight (Kg)

Operator (kg)

12,5

Supporting box (kg)

15.3

Operator dimensions (mm)

362 x 153 H 127

Supporting box dimensions (mm)

See fig.3

 Values   obtained from laboratory testing.

4. INSTALLATION

Max usage curve

The curve (fig.4) makes it possible to identify the maximum operation 
time (T) depending on the frequency of use (F) for 230V~ motors.
To guarantee good operation it is necessary to remain within the work 
range below the curve.

  The curve is obtained at a temperature of 20°C. Exposure to direct 

sunlight can determine a drop in usage frequency up to 20%.

H

OW

 

TO

 

CALCULATE

 

THE

 

USAGE

 

FREQUENCY

Ta + Tc

%F= 

 x100

Ta + Tc + Tp + Ti

Ta

 = opening time

Tc

 = closing time

Tp

 = pause time

Ti

 = interval between one complete cycle and the next

4.1  ELECTRICAL PREPARATIONS (STANDARD SYSTEM)

With reference to the fig.5:

Pos.

Description

Cable Nr. and Diam. 

Gearmotor

230 V~

4x1.5mm

2

24 V

"

2 x see table

Control unit (system power supply)

3x1.5mm

2

TX Photocells

2x0.5mm

2

RX Photocells

4x0.5mm

2

2x0.5mm

(BUS)

Key switch

2x0.5mm

2

Flashing lamp

2x1.5mm

2

 For cable installation, use adequate rigid and/or flexible tubes.

 Separate the 230 V~ power cables from the low-voltage ones.

24V 

MOTOR

 

CABLE

 

DIAMETER

Operator - Board distance

Up to 15 m

From 15 m to 25 m

From 25 m to 35m

Conductor 
diameter

2.5 mm

2

4 mm

2

6 mm

2

4.2 PRELIMINARY CHECKS

1. 

The

 mechanical elements used for construction must comply with 

EN 12604 and EN 12605 Standards

.

2. 

The

 leaf structure must be suitable for automation

.

3. 

Minimum distance between the lower edge of the leaf and the floor, as 
shown in fig.6.

4. 

Presence of mechanical leaf limit stops.

5. 

Check

 for the presence of only the upper hinge

.

 The condition of the structure directly affects the reliability 

and safety of the automated system.

  Before installing the automated system, carry out any necessary 

smith work on the gate.

4.3  INSTALLING THE SUPPORTING BOX

1. 

Choose

 the orientation of the box according to the dimensions shown 

in

 fig.7 and 8.

2. 

Dig a hole to position the supporting box

 

(fig.9).

 

Modify the dimensions of the hole based on the type of ground (the 

dimensions in fig.9 refer to the minimum dimensions of the hole).

3. 

Position the box as shown in fig.10.

4. 

Place a rigid tube or a flexible sheath for passage of the power supply 
cables, fig.11 ref.

.

5. 

Place a tube for draining rain water, fig.11 ref.

.

6. 

Ensure that the box is walled-in flat.

4.4  INSTALLING THE LEAF

1. 

Create

 a leaf containment frame as shown in

 fig.12.

2. 

Determine the position of the leaf based on the rotation axis.

Summary of Contents for 770 N

Page 1: ...770 N 770 N...

Page 2: ...START UP 4 6 MANUAL OPERATION 4 7 RESTORING NORMAL OPERATION 4 8 AVAILABLE ACCESSORIES 4 9 MAINTENANCE 4 10 REPAIRS 4 11 SPECIAL APPLICATIONS 4 CE DECLARATION OF CONFORMITY Manufacturer FAAC S p A Ad...

Page 3: ...H 127 Supporting box dimensions mm See fig 3 Values obtained from laboratory testing 4 INSTALLATION Max usage curve The curve fig 4 makes it possible to identify the maximum operation time T dependin...

Page 4: ...covering the plug fig 22 ref 3 Insert the key and turn it until it stops fig 22 ref 4 Open the release lever fig 22 ref 5 Manually move the leaf fig 22 ref 6 Place the release lever back in position 7...

Page 5: ...8 9 2 3 6 5 4 10 10 7 0 5 100 1 1 25 1 5 1 8 2 2 25 2 5 3 3 25 3 5 200 300 400 500 600 Kg mt 307 5mm 430mm 156mm 214mm 1 10 2 3 4 5 6 7 8 9 10 11 12 20 30 40 50 60 70 80 90 100 h 1 1 5 6 4 3 3 4 2 68...

Page 6: ...770 N 6 732615 Rev A 65 mm 440 mm 315 mm 440 mm 156 mm 315 mm 35mm max 50mm max C 340mm Min 40mm C 1mm Min 10mm...

Page 7: ...770 N 7 732615 Rev A 1 OPEN OPEN 1 2 3 4 2 1 1 2 3 4 22 21 23...

Page 8: ...770 N 8 732615 Rev A 24 25 26 27 28...

Page 9: ...770 N 770 N User s Guide...

Page 10: ...e When in rest position the gate leafs are closed When a pulse is sent the unit sets the motor in motion which will begin to open the leafs until opening is complete Once the opening phase is complete...

Page 11: ..._____________________________________________ Technician Customer _____________________________________________ _____________________________________________ _________________________________________...

Page 12: ...c com au INDIA FAAC INDIA PVT LTD Noida Delhi India tel 91 120 3934100 4199 www faacindia com SWITZERLAND FAAC AG Altdorf Switzerland tel 41 41 8713440 www faac ch CHINA FAAC SHANGHAI Shanghai China t...

Reviews: