background image

ENGLISH

Notes on reading the instructions

Read this instruction manual to the letter before you begin to install the product.

Symbol   highlights notes that are important for people’s safety and for the good condition of the automated system.

Symbol 

 draws your attention to the notes about the product’s characteristics or operation.

INDEX

CE DECLARATION OF CONFORMITY FOR MACHINES .......................................................................................................... 2

WARNINGS FOR THE INSTALLER ........................................................................................................................................... 2

1 DESCRIPTION AND TECHNICAL SPECIFICATIONS .............................................................................................................. 3

2. INSTALLING THE AUTOMATED SYSTEM.............................................................................................................................. 3

2.1. PRELIMINARY CHECKS ............................................................................................................................................ 3

2.2. INSTALLING THE JACK ............................................................................................................................................. 3

2.3. INSTALLING THE HYDRAULIC CONTROL UNIT ........................................................................................................... 4

2.4. HYDRAULIC CONNECTION ...................................................................................................................................... 4

2.5. AIR BLEED OPERATIONS .......................................................................................................................................... 4

2.6. INSTALLING THE GATE ............................................................................................................................................. 5

3. OPERATION ..................................................................................................................................................................... 5

3.1. CHECKING THE SENSE OF ROTATION ....................................................................................................................... 5

3.2. SETTING OPERATION TIME ....................................................................................................................................... 5

3.3. SETTING THE ANTI-CRUSHING SYSTEM ..................................................................................................................... 5

4. TESTING THE AUTOMATED SYSTEM ................................................................................................................................... 5

5. MANUAL OPERATION ....................................................................................................................................................... 5

6. MAINTENANCE ................................................................................................................................................................ 5

Summary of Contents for 750 CBAC

Page 1: ...750 ...

Page 2: ...on sur les remarques concernant les caractéristiques ou le fonctionnement du produit Vor der Installation des Produkts sind die Anweisungen vollständig zu lesen Mit dem Symbol sind wichtige Anmerkungen für die Sicherheit der Personen und den störungsfreien Betrieb der Automation gekennzeichnet Mit dem Symbol wird auf Anmerkungen zu den Eigenschaften oder dem Betrieb des Produkts verwiesen Lean com...

Page 3: ...Inserto Immagini Pictures Collection Collection de Figure Cojunto de Imagenes Photo Kollektion Fotoverzameling 2 1 5 4 3 200 152 175 400 124 5 6 5 7 7 6 1 2 3 ...

Page 4: ...4 270 224 470 5 min 60 5 124 152 175 100 270 250 450 470 90 6 a min 60 5 124 152 175 100 270 250 450 470 90 6 b ø 32 mm 7 8 ...

Page 5: ...min 1550 max 2840 9 10 245 6 3 5 3 65 1 4 1 5 8 0 5 11 ø 5 12 255 3 6 2 max 65 13 ø 30 14 ...

Page 6: ...min 100 15 16 C A B D CLOSE OPEN INT EXT 17 18 19 MAX MIN 20 ...

Page 7: ...1 2 21 22 min 250 23 24 a 24 b 25 ...

Page 8: ...26 a 26 b 27 28 29 ...

Page 9: ...ion INDEX CE DECLARATION OF CONFORMITY FOR MACHINES 2 WARNINGS FOR THE INSTALLER 2 1 DESCRIPTION AND TECHNICAL SPECIFICATIONS 3 2 INSTALLING THE AUTOMATED SYSTEM 3 2 1 PRELIMINARY CHECKS 3 2 2 INSTALLING THE JACK 3 2 3 INSTALLING THE HYDRAULIC CONTROL UNIT 4 2 4 HYDRAULIC CONNECTION 4 2 5 AIR BLEED OPERATIONS 4 2 6 INSTALLING THE GATE 5 3 OPERATION 5 3 1 CHECKING THE SENSE OF ROTATION 5 3 2 SETTIN...

Page 10: ...specified in the Standards indicated at point 10 16 The safety devices EN 12978 standard protect any danger areas against mechanical movement Risks such as crushing dragging and shearing 17 Use of at least one indicator light e g FAACLIGHT is recommended for every system as well as a warning sign adequately secured to the frame structure in addition to the devices mentioned at point 16 18 FAAC dec...

Page 11: ...le 118 200 Max torque Nm 543 750 CBAC SB 272 750 SBS Angular speed sec 7 8 750 CBAC SB 5 2 750 SBS Amount of oil l 0 3 0 5 Protection class IP 67 Weight Kg 8 9 750 AUTOMATED SYSTEM 2 INSTALLING THE AUTOMATED SYSTEM 2 1 PRELIMINARY CHECKS For correct operation of the automated system the existing gate structure or the one to be built must feature the following weight of each leaf no heavier than 80...

Page 12: ...ntimetres the centre of the corresponding fittings fig 15 16 The control unit fitting beside the green by pass screw must be connected to the jack fitting that is within the property boundaries fig 17 ref B The control unit fitting beside the red by pass screw must be connected to the jack fitting that is outside the property boundaries fig 17 ref A These connections make it possible to adjust the...

Page 13: ...te opens If the first OPEN pulse commands closing invert the phases of the electrical motor on the unit terminal board brown and black wires 3 2 SETTING OPERATION TIME Opening Closing time is determined by programming the electronic control unit see corresponding instructions To obtain maximum efficiency of the hydraulic locking system it is necessary to program an opening closing time that allows...

Page 14: ...en und Abbildungen in vorliegendem Handbuch sind unverbindlich FAAC behält sich das Recht vor ohne die wesentlichen Eigenschaften dieses Gerätes zu verändern und ohne Verbindlichkeiten in Bezug auf die Neufassung der vorliegenden Anleitungen technisch bzw konstruktiv kommerziell bedingte Verbesserungen vorzunehmen Las descripciones y las ilustraciones de este manual no comportan compromiso alguno ...

Reviews: