background image

8

ENGLISH

ENGLISH

748-24V AUTOMATION SYSTEM

These instructions apply to the following models:

Operators 748-24V and 724MPS

The FAAC 748-24V automation system for sliding residential gates is an
electromechanical operator that transmits the leaf movement by
means of a pinion coupled to a rack fixed to the gate.
The irreversible system locks mechanically when the motor is not
running, so it is not necessary to install a lock.

1.

DESCRIPTION AND TECHNICAL SPECIFICATIONS

a

Cover

b

Supports for cover guides (2)

c

Support for electr. control unit

d

Electronic control unit

e

Opening for cables

f

Releasing device with key

g

Bores for fastening cover (4)

h

Slots for fastening operator

i

Toroidal transformer

j

Pinion Z16

k

Electric motor

l

Earth connection of operator

m

Encoder

Fig. 1

Table 1: Technical specifications of “748-24V Operator”

Power supply

24Vdc

Absorbed power (W)

70

Current drawn (A)

3

Electric motor

1400 rpm

Pinion

Z16

Rack

module 4 - pitch 12.566

Max. torque (Nm)

13.5

Max. thrust (daN)

40 (Z16)

Duty cycle

70% (

see paragraph 1.1)

Temperature range (°C)

-20 

v

 +55 °C

Weight of operator (Kg)

10

Housing protection

IP 44

Max. gate weight (Kg)

400

Gate speed (m/min)

12 (Z16)

1.1. MAXIMUM DUTY CYCLE CURVE

The curve makes it possible to determine the maximum operating time
(T) as a function of the duty cycle (F), e.g., the 748-24V operator can
work continuously at a duty cycle of 70%.
To ensure smooth running, operation should be kept within the duty
area below the curve.
Important: the curve was plotted on the basis of operation at 24 °C.
Allow for up to 20% reduction of duty cycle in case of exposure to
direct sunlight.

Calculating the duty cycle

The duty cycle is the
proportion of the actual
operating time (o
closing) with respect to the
total time of the cycle
(o c pause
time).
The formula for calculating it is
the following:

 

%F= 

        To + Tc           

  x 100

         

 To + Tc + Tp + Ti

where:
To = opening time;
Tc = closing time;
Tp = pause time;
Ti = duration of interval between a complete cycle and the next one.

2.

STANDARD INSTALLATION LAYOUT

10

20

30

40

50

60

70

80

90

100

0

1

2

3

4

5

6

7

8

9

10 

10 11 12

Tiempo (h)

Zeit (Std.)

Temps (h)

Time (h)

Tempo (h)

3.

INSTALLATION OF AUTOMATION SYSTEM

3.1. PRELIMINARY CHECKS

To ensure trouble-free operation, make sure that the gate (whether
existing or yet to be installed) has the following specifications:
• Max. gate weight 400 kg.
• Strong and rigid leaf frame.
• Flat leaf face, with no protruding parts and no vertical members.
• Smooth and even movement of the gate over its entire travel.
• No sideways oscillation of the leaf.
• Upper and lower sliding system in perfect conditions.

The use

of floor tracking with a rounded channel is preferable to reduce
friction in the sliding movement.

• Only two slide wheels.

Mechanical safety stops to avoid risk of derailment. These stops must
be firmly fixed to the ground or to the floor track, about 2 cm beyond
the travel limit.

• No mechanical locks.
If any welding or brazing is required on the gate, it should be done
before installing the automation system.
The condition of the structure directly affects the reliability and safety
of the automation system.

RX

TX

a

748-24V Operator

b

Photocells

c

Key-operated pushbutton

d

Flashing lamp

e

Radio receiver

Use suitable rigid/flexible pipes for laying power cables.

•Always keep low voltage accessory cables separate from 230V~ power

cables. To avoid interference, use separate sheaths.

Fig. 2

2

3

4

1

9

8

6

7

13

11

10

5

12

Summary of Contents for 748-24V

Page 1: ...A Z I E N D A C E R TIF I C A T A UNI EN ISO 9001 085 para la naturaleza 100 papel reciclado ist umweltfreundlich 100 Altpapier pour la nature papier recycl 100 for nature recycled paper 100 carta ric...

Page 2: ...ne or for assembly with other machines to constitute a machine under the provisions of Directive 89 392 EEC and subsequent amendments 91 368 EEC 93 44 EEC 93 68 EEC conforms to the essential safety re...

Page 3: ...ght Calculating the duty cycle The duty cycle is the proportion of the actual operating time opening closing with respect to the total time of the cycle opening closing pause time The formula for calc...

Page 4: ...ws TE 8 x 50 are provided N B it is advisable to tighten the rack fixing screws at the top of the slot This allows the rack to be raised if with time the gate tends to sink 2 Release the operator see...

Page 5: ...justed through self learning at installation 3 built in LEDs constantly indicate status of both control unit and gearmotor The control unit is designed for installation in a container on the gearmotor...

Page 6: ...port 5 Secure the control unit in position C by fitting four 3 9x6 5 self tapping screws supplied in the guides of the watertight container Procedure for securing the encoder on the gearmotor fig 14 1...

Page 7: ...e it to about midway through opening travel and then lock it 2 Power up the control unit power ON is signalled by the POWER LED 3 Turn switch S2 to PROG the flashlight goes on at steady light to signa...