background image

2

CONTENTS

 455 D Control Board - Rev: 01 - October 2010  

455 D Control Board

1. 455 D CONTROL BOARD 

3

1.1 455 D Control Board Warnings 3

1.2. Technical Specifications 

3

1.3 Electric Connections 

3

1.4. 455 D Layout and Components 

3

1.5 Programming 

7

1.6 Start-Up 

9

1.7 System Test 

10

2. OPERATING MODES DETAILED DESCRIPTION  

11

3. PREWIRED ENCLOSURE DIAGRAM 

13

4. POWER AND ACCESSORIES CONNECTIONS 

14

AC Power Wiring Guidelines 

14

AC Power Connection 

14

Magnetic Lock Connection 

14

LIMITED WARRANTY 

15

Read this instruction manual before you begin installing the product.

  = Information regarding personal safety and proper maintanence of the product.

 = Information regarding the product’s characteristics or operation.

(800) 878-7829

www.FastGateOpeners.com

Summary of Contents for 455 D

Page 1: ...455 D Control Board 800 878 7829 www FastGateOpeners com...

Page 2: ...est 10 2 OPERATING MODES DETAILED DESCRIPTION 11 3 PREWIRED ENCLOSURE DIAGRAM 13 4 POWER AND ACCESSORIES CONNECTIONS 14 AC Power Wiring Guidelines 14 AC Power Connection 14 Magnetic Lock Connection 14...

Page 3: ...afety Devices Closing Safety Devices Power Supply Earth Terminal Board Outputs Flashing Lamp Motors 24 VDC Acces sories Power Supply 24 VDC Indicator Light Fail Safe 12 VAC Electric Lock Power Supply...

Page 4: ...nst the risk of impact and crushing Opening Closing Safety Devices Closing Safety Devices Opening Safety Devices Connection of ONE Pair of Closing Photocells and ONE Pair of Opening Closing Photocells...

Page 5: ...e K Connection of ONE Pair of Opening Photocells Connection of ONE Pair of Opening Photocells and ONE Pair of Closing Photocells Connection of TWO Pairs of Closing Photocells Connection of ONE Pair of...

Page 6: ...y prevent the leaf closing movement NB If no closing safety devices are connected jumper connect terminals CL and TX FSW Fig G OP FSW Opening safety devices contact N C The purpose of the opening safe...

Page 7: ...e Learning OPERATING LOGICS see tab 3 a h If using hydraulic operators set force to maximum level 1 4 7 Terminal Block J6 Limit Switch or Gatecoder 1 5 1 Basic Programming To access BASIC PROGRAMMING...

Page 8: ...d Differentfigurescorrespondtotheextra time compared to normal work time opening or closing whentheoutputcanbeused viaarelay to power a courtesy light Time can be adjusted from to sec in 1 sec steps a...

Page 9: ...on or radio control 1 OPEN Slow down at opening of leaf 1 2 OPEN Leaf 1 stops at opening and leaf 2 begins its opening movement 3 OPEN Slow down at opening of leaf 2 4 OPEN Leaf 2 stops at opening and...

Page 10: ...ress push button F to exit and save the programming The procedure is complete and the gate is ready to operate Notes The slow down pulse should be given before the gate reaches the positive stop to pr...

Page 11: ...c e s a e l e r n o d n a s k c o L g n i n e p o D E K C O L 3 f a e l e h t s e s o l C t c e f f e o N d e l b a s i d N E P O t c e f f e o N t c e f f e o N d e l b a s i d N E P O E c i g o L S...

Page 12: ...stops operation NB Effects on other active pulse inputs in brackets P A c i g o L S E S L U P S U T A T S E T A G A N E P O B N E P O P O T S S E C I V E D Y T E F A S G N I N E P O S E C I V E D Y T...

Page 13: ...13 455 D Control Board 3 PREWIRED ENCLOSURE DIAGRAM 800 878 7829 www FastGateOpeners com...

Page 14: ...ht ning Use a grounding rod if necessary A surge suppressor is recommended for additional protec tion AC Power Connection 1 Turn the circuit breaker for the AC gate operator power to OFF before connec...

Page 15: ...ubject to misuse negligence or accident or has not been operated in accordance with FAAC Inter national Inc s or FAAC S p A s instructions or has been operated under conditions more severe than or oth...

Reviews: